BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a playground / park / athletic field in Moorpark, California. Completed plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

Resurfacing and restriping the tennis courts at Arroyo Vista Community Park, resurfacing and restriping the basketball courts at Poindexter Park and Campus Canyon Park, and windscreen replacement at Tierra Rejada Park in accordance with the RFB. Questions about this RFB must be submitted by email to the City's RFB administrator, Liz Smith at purchasing@moorparkca.gov. Requests for clarification or correction must be received no later than December 16, 2022, at 4:00 p.m. (PT). Additional Considerations: All work shall be completed by January 28, 2023. The successful proposer, as Contractor, will furnish all labor and materials, appliances, tools, equipment, facilities, transportation, storage, and services necessary to complete tennis court and basketball court resurfacing and restriping at the following parks: Arroyo Vista Community Park, 4550 Tierra Rejada Road, Moorpark, CA 93021 - Eight (8) tennis courts Poindexter Park, 500 Poindexter Avenue, Moorpark, CA 93021 - One (1) basketball court Campus Canyon Park, 6970 Campus Canyon Drive, Moorpark, CA 93021 - One (1) basketball court At the completion of court re-surfacing activities and once surface has thoroughly cured, contractor shall be responsible for laying out tennis court line markings and basketball court line markings, in accordance with the specifications in Attachment 6. Additionally, contractor shall be responsible for laying out pickleball court line markings, in addition to tennis court line markings, on four (4) tennis courts at Arroyo Vista Community Park, for a total of eight (8) pickleball courts. Tennis court line markings shall be the primary court markings. Pickleball court line markings shall not cross tennis court line markings. City shall approve said courts prior to the start of work. Contractor, will furnish all labor and materials, appliances, tools, equipment, facilities, transportation, storage, and services necessary to replace the wind screen at the following parks: Tierra Rejada Park, 11900 Mountain Trail Street, Moorpark, CA 93021 - Four (4) pickleball courts

Under Construction

Playgrounds / Parks / Athletic Fields

$83,789.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
81
Bidding Soon
1,825
All Active Projects
798
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2022

January 24, 2023

img_map_placeholder

Multiple Locations, Moorpark, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.