BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in McKenzie, Tennessee. Completed plans call for the renovation of a educational facility.

Serving Line at McKenzie Middle School A. It is required that all fabricated equipment such as food serving units, tables, sinks, counter tops, etc., described in following specifications other than by name and catalog numbers, be manufactured by an equipment fabricator who has the plant, personnel and engineering facilities to properly design, detail and manufacture high quality food service equipment. The manufacturer to be subject to approval of the Owner. All work in the above category manufactured by one manufacturer and of standard unit assembly and uniform design and finish. B. The manufacturer of this equipment must be able to show that he is now, and has been engaged in the manufacture or distribution of equipment as required under this contract as his principal product. C. Upon demand, manufacturer being considered for possible negotiation, shall submit to the Owner, evidence of his/her having executed contracts of a size comparable to this contract. He shall further submit evidence of ample financial resources which enable him to handle the work in a satisfactory manner, and to delivery items of equipment as desired, without delaying the process of the work. D. The manufacturer of this equipment as herein specified is a recognized distributor for the items of equipment specified herein to be of other manufacture than his own. E. Quality Assurance: a. Manufacturer's Qualifications: Firms regularly engaged in manufacture of food service equipment types, capacities, and sizes required, whose products have been satisfactory use in similar service for not less than 5 years. b. Installer's Qualifications: Firms with at least 3 years of successful installation experience on projects with food service equipment similar to that required for project. c. Fabricator's Qualifications: Where indicated units required custom fabrication, provide units fabricated by shop which is skilled and with a minimum of 5 years of experience in similar work. Fabricate all custom equipment items at same shop. Where units cannot be fully shop-fabricated, it will be acceptable to complete fabrication work at project site. F. Only manufacturers who can meet the foregoing qualifications will be considered to be approved The method of Contractor Selection has not been Determined at this time

Award

Educational

$71,110.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
22
Bidding Soon
368
All Active Projects
147
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2022

March 14, 2023

img_map_placeholder

80 Woodrow Ave, McKenzie, TN

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.