Site work and paving for a mixed-use development in Houston, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Bid Results: Teskota Enterprise, LLC - $3,247,938 Scohil Construction Services, LLC - $3,647,738 Resicom Inc -$3,759,995.56 The work in this contract is for the Champions North & Northwest Water Line Rehabilitation for Champions Municipal Utility District (Champions MUD) located in Harris County, Texas. The purpose of this project is to replace aging water lines in the Champions North & Northwest neighborhoods and along Champion Forest Drive, including gate valves and fire hydrants, to prevent future water main breaks in the area. Installation of 6-inch, 8-inch, and 12-inch AWWA C-900 water line, by trenchless construction, for all depths, including restrained joints, bends, fittings, open right gate valves with boxes, and Mueller, or approved equal, fire hydrant assemblies. Disinfection and hydrostatic testing shall be completed by the Contractor. Installation of minimum 14-inch and 20-inch steel casing, by trenchless construction, including fittings. Contractor shall make sure proposed water line with restrained joints and spacers has the needed clearance for installation inside the proposed steel casing. Connection of the new water lines to the existing water system by tapping sleeve and valves and wet connections. Installation of 8-inch and 12-inch gate valves. Contractor shall install valve extensions for valves deeper than 8 feet. Installation and connection of new long-side and short-side service leads, all diameters, from new water line to existing residential water meters using tapping saddle with stainless steel band, including Accurate Meter or Core and Main corporation valves and ball valve curb stops, or approved equal, with u-branches or standard compression fittings at the meter connection. Service lines for inch water meters shall be a single 1-inch service line with a 1-inch by inch u-branch for two meters or standard compression fitting for one meter. Service lines for water meters 1-inch and larger shall be a single line that matches meter size for each meter. No 90-degree curb stops will be allowed. It will be the Contractors responsibility to ensure that all residential meters are reconnected to the new water line. Installation and connection of new service leads, to match existing service lead diameter, from the new water line to the existing commercial water meters and irrigation water meters using stainless steel tapping saddle or sleeve including Accurate Meter or Core and Main corporation valves and ball valve curb stops, or approved equal. No 90-degree curb stops will be allowed. It will be the Contractors responsibility to ensure that all commercial and irrigation meters are reconnected to the new water line. Abandonment of existing water lines, all sizes, all depths, including cutting, draining, plugging, and grouting the existing water line as shown in the plans. Removing existing fire hydrant assemblies and plugging the old fire hydrant connection on the existing line. Existing fire hydrants that are removed are to be salvaged and returned to Champions MUD. Installation of air release and vacuum relief valve manhole. Site restoration of Champions Golf Club Property and Harris County Right of Way disturbed areas including replacing damaged sidewalks, ramps, driveways, pavement, turf, plants, shrubs, trees, irrigation lines, fences, and gates. Implementation, maintenance, and removal of traffic control plan, trench safety, and storm water pollution prevention plan best practices including inlet protection barriers. Reconnection of fire line service taps, to match existing diameter, from the existing lead to the new water line using tees or tapping sleeve and valves. It is the Contractors responsibility to ensure that all fire lines are reconnected to the new water line. After the fire line has been connected to the new water line, the Contractor will be required to have the buildings fire system tested to ensure the fire system is working properly. All bids should include the number of calendar days that are expected to complete the work. If the bid does not state the number of calendar days, then a value of 270 days will be assumed and entered into the Standard Form of Agreement.

Bid Results

Water / Sewer

$3,247,938.00

Public - County

Paving, Site Work

61

16

11

10

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
59
Bidding Soon
2,739
All Active Projects
1,055
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2023

February 9, 2023

img_map_placeholder

Multiple Locations, Houston, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.