BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Mount Vernon, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

10.8 miles of reconstruction/rehabilitation on I-64 from 0.3 miles east of Shiloh Road to just east of the Washington County line. Region 5 District 9 Federal Project # N/A County(s) Jefferson Key Route(s) FAI 64 Marked Route(s) I-64 Section(s) (41-6,41-6-1,41-7)RS-2;BSMART State Job #(s) C-99-058-17 PPS #(s) 9-00621-0200 9-00621-0210 The work on this project is located on FAI Route 64 (I-64) in Jefferson County from 0.3 miles east of Shiloh Road westerly to just east of the Washington/Jefferson County line, west of Mt. Vernon, Illinois. Questions not accepted as of January 10, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, December 30, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 104 - Reconstruction / Rehabilitation on I-64 The work on this project consists of reconstructing/rehabilitating 10.77 miles of I-64 with hot-mix asphalt surface removal, hot mix asphalt binder, CRC pavement, PCC shoulders, underdrain extensions, culvert extensions, median inlet removal and replacements, bridge rehabilitation, ramp surface removal, ramp hot-mix asphalt resurfacing, tree removal, earth excavation, furnished excavation, aggregate shoulders, steel plate beam guardrail, lighting base adjustments, seeding, pavement marking, overhead sign removal and replacement, and all other miscellaneous work necessary to complete this section.

Bid Results

Roads / Highways

$94,073,768.00

Public - State/Provincial

Paving, Site Work

1054

8

35

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
48
Bidding Soon
832
All Active Projects
388
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 20, 2023

February 20, 2023

May 31, 2026

img_map_placeholder

I-64, Mount Vernon, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.