Demolition, site work, paving, outdoor lighting and new construction of a civil project in Woodstock, Illinois. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; for outdoor lighting for a road / highway; road / highway; and road / highway.
As of May 20, 2024, per owner, design team has been identified. The RFQ was for Phase I/Phase II Engineering. They have just started Phase I. This will last 12-18 months. Phase II will follow and take another 12-18 months. Then after all IDOT approvals and ROW acquisition, they will be able to go out for bid in November 2027 and for construction in 2028. December 19, 2022 Vendor Questions Submitted via E-Mail Due No Later than 4:00PM CST December 22, 2022 Vendor Questions Answered via Addendum No Later than 4:00PM CST Qualifications are requested for Phase I and Phase II Engineering Services for the Charles Road over Slough Creek (056-3006) bridge rehabilitation/reconstruction project within the County of McHenry McHenry County Division of Transportation desire to contract with a qualified engineering firm to assist the County of McHenry in developing Phase I and Phase II Engineering for the rehabilitation or replacement of the Charles Road over Slough Creek (056-3006) County bridge. All work shall conform to IDOT/FHWA policies and procedures for federal aid projects and will be completed under applicable BLR and BDE Manuals. The Charles Road bridge (SN 056-3006) was originally constructed in 1947 as a 31-foot single span concrete slab bridge on closed concrete abutments. The superstructure was reconstructed in 1984 with PPC deck beams. The sufficiency rating is 61.7 (2022), and the superstructure is rated 4 (poor) and substructure rated 5 (fair). The sufficiency rating was 81.8 and 63.1 in 2018 and 2020, respectively. Guardrail is mounted to the outside beams. Temporary concrete barriers were placed along the north side of the bridge in 2018 due to a guardrail hit that damaged the outside beam. The bridge roadway width is 40 feet. The approach roadway width is 32 feet. The bridge is open with no load restrictions. The Charles Road bridge is located 400 feet east of the Charles Road/Alden Road/Nelson Road three-legged intersection. The Nelson Road approach is stop controlled. All approaches are on horizontal curves. There is a mast arm street light mounted on a wood pole in the south quadrant. The Charles/Alden/Nelson Road intersection is identified as a high-tier intersection on the 2017 Local Jurisdiction Safety Tier map. Within the influence of the bridge (limits of guardrail), there were 6 crashes of which three resulted in injuries from fixed objects. Within the influence of the intersection (200 feet each leg), there were 15 crashes of which two resulted in injuries. Intersection improvements should also be considered as a part of this bridge rehabilitation/reconstruction project. December 19, 2022 Vendor Questions Submitted no later than 4:00 PM (CST) Submit by e-mail: purchasing@mchenrycountyil.gov; CC email: gwbauernfeind@mchenrycountyil.gov December 22, 2022 Vendor Questions Answered no later than 4:00 PM (CST) Posted to the County Website as an Addendum January 16-27, 2023 County Staff Review TBD Interviews before Selection Committee, if applicable April 18, 2023 County Board Approval of Selected Consultant (Anticipated) May 1, 2023 Project Starts (Anticipated) The Method of Contractor Selection has not been determined at this time.
Design
Roads / Highways
$1,082,000.00
Public - County
Demolition, New Construction, Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2028
Charles Rd, Woodstock, IL
Related To This Project
Woodstock, IL
Bid Date: Mar 09 2022
Woodstock, IL
--
Woodstock, IL
--
Woodstock, IL
--
Woodstock, IL
Bid Date: Mar 04 2022
Woodstock, IL
Bid Date: May 06 2022
Woodstock, IL
--
Woodstock, IL
Bid Date: Jan 10 2023
Woodstock, IL
--
Woodstock, IL
--
Woodstock, IL
Bid Date: Jul 10 2019
Woodstock, IL
--
Woodstock, IL
Bid Date: Dec 02 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.