BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Columbus, Ohio. Completed plans call for site work for a water / sewer project.

Dikes 1 and 2 will need the water control structures replaced and the new control structures moved back from the upstream toe to the edge of top crest and the dikes repaired Inquiry End Date 12/30/2022 10:00:00 AM Work may commence March 1st, 2023 and shall be completed no later than May 31, 2023. o Dike 1 will need to have the topsoil removed from top of the dike before any repairs are performed. The topsoil can be stored onsite as directed by the Area Manager. o Dike 1 shall be keyed, the whole length of the dike (1,190 ft), 3 feet below normal ground level thru the center of the dike with a minimum width of 24". Any/all existing holes and voids shall be plugged with clay fill and compacted in 6" lifts. The keyed area will also be backfilled and compacted in 6" lifts. o Any existing root balls within Dikes 1 and 2 will need to be removed, along with the beaver lodge on the east side of Dike 1, and the existing holes will need to be filled with clay and compacted in 6" lifts. The root balls and lodge material shall be hauled off and disposed of by the contractor. o Clay fill for the repairs will be provided by the contractor. o Final dike top elevation shall remain at current height. o Sides will be regraded to a uniform slope no steeper than 4:1 from crest to toe on both sides. Top will be a minimum of ten feet and graded to a uniform elevation for the entire length of the dike. o The contractor will be responsible for removing the old water control structures. o The water control structures and pipe to be installed will be supplied by the Division of Wildlife. o Installation of the water control structure(s) shall follow manufacturer instructions, unless otherwise directed by the Area Manager. o Topsoil will need to be placed (graded and smoothed) on top of the clay fill on both the top and sides of the dike, any additional topsoil needed will be supplied by contractor.

Post-Bid

Water / Sewer

$50,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
46
Bidding Soon
1,016
All Active Projects
435
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2023

March 1, 2023

img_map_placeholder

Multiple Locations, Columbus, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.