BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a playground / park / athletic field in Desert Hot Springs, California. Completed plans call for the renovation of a playground / park / athletic field.

Question Deadline 12/21/2022 at 12:00 PM PT Prebid inquiries should be directed to Ms. Jilleen Ferris P.E. City Engineer at (760) 329-6411X220 or via email at jferris@cityofdhs.org It shall be the Contractor's responsibility to provide and furnish all materials, tools, labor and incidentals to complete the work as outlined in the Project Description and as shown in the Specifications and Contract Documents for Guy J. Tedesco Park Restroom Replacement project. It shall be the Contractor's responsibility to thoroughly review the project area, familiarize itself with the scope of proposed work and submit the proposal for the work accordingly. The proposed improvements include the furnishing of all labor and materials and equipment for the Guy J. Tedesco Park Restroom Renovation, consisting of removal and existing improvements and the construction of concrete curb & gutter, sidewalk, curb ramps, cross gutter, and driveway approaches; modification of existing curb ramps; placement of asphalt concrete patches adjacent to new concrete improvements; removal and reconstruction of asphalt concrete pavement on aggregate base; installation of street lighting conduits and pull boxes (SCE forces to install street light foundations, poles, and conductors); installation of solar-powered flashing traffic signs on new poles; removal and relocation of residential mail boxes; and the installation of new pavement markers and thermoplastic and paint traffic lines, markings, and legends. Removed material shall be legally disposed of off-site at the Contractor's expense. All project work and incidental items to complete the project shall be performed in accordance with the Plans, specifications, and other provisions of the contract. All the above improvements are to be constructed in a workmanlike manner, leaving the entire project in a neat and presentable condition. Refer to Technical Specifications. March 29, 2023 Construction begins May 9, 2023 Construction completed

Post-Bid

Playgrounds / Parks / Athletic Fields

$678,553.00

Public - City

Renovation

12

10

2

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
49
Bidding Soon
821
All Active Projects
402
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2023

March 29, 2023

img_map_placeholder

12-800 W Arroyo Dr, Desert Hot Springs, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.