BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Blue Bell, Pennsylvania. Completed plans call for site work for a water / sewer project.

Stream restoration along 2,840 feet of the Wissahickon Creek through Cedarbrook Country Club. Project is split into 3 different areas. Majority of the work is along the creek without impact to the golf course greens. Access available via the existing paved cart paths. CLARIFICATION DEADLINE 5/15/2023 2:00 PM The Bids will be received for the following Contract: WISSAHICKON CREEK STABILIZATION AND ENHANCEMENT - Phase 2 The contract involves the bio-engineered stabilization of stream banks along the Wissahickon Creek, including the following: 1. Use of well-graded stone for toe protection. 2. Grading of embankments with erosion control fabric and a combination of woody and herbaceous plants. 3. Geotextile Soil Wrap with brush layering. This Project was financed in part by a Grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority. All proposals shall be submitted in accordance with INSTRUCTIONS TO BIDDERS, paragraph 14- Bid Submission. A Certified Check or Bid Bond drawn to the order of Whitpain Township in the amount equal to ten percent (10%) of the amount of the bid must be submitted with the proposal as bid security. This Project is subject to Ordinance No. 394, Responsible Contractor Ordinance. Except as otherwise provided by law, no Bidder may withdraw his bid within sixty (60) consecutive calendar days after the actual date of opening thereof or one hundred twenty (120) consecutive calendar days if the award is delayed by a required approval of another governmental agency, the sale of bonds or the award of a grant or grants. Whitpain Township hereby reserves the right, which is understood and agreed to by all bidders, to refuse any or all bids submitted; and reserves the right to waive any informality in bids received, but any contract awarded will be to the lowest responsive, responsible bidder.

Award

Water / Sewer

$268,620.00

Public - City

Site Work

12

11

2

7

Subscribe For Documents

121 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
443
Active Projects
218
Bidding Soon
4,051
All Active Projects
1,926
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2023

June 19, 2023

img_map_placeholder

180 Penllyn Blue Bell Pike, Blue Bell, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.