EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 24, 2023 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Center Line, Michigan. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

This work involves earth clearing and excavation, grading and construction of hot mix asphalt parking lot, concrete curbs, concrete sidewalks, underground storm sewer, and other miscellaneous items. The approximate quantities involved in this work are as follows: Earth Clearing and Excavation 1000 Cyd HMA, 5E1 200 Ton HMA, 3E1 200 Ton Concrete Curb and Gutter 700 Ft Concrete Sidewalk 2500 Sft Underground Storm Sewer 30 Ft Memorial Field, Entry Arch 1 LSUM together with related work as well as deliverables, clean-up and restoration. Buyer's Requirements General Requirements - Bid Deposit Required - Contractors License Required - Installation Required - Insurance Required - Safety Standards Plan - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % Questions are submitted online No

Post-Bid

Sidewalks / Parking Lot

$3,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
110
Bidding Soon
1,458
All Active Projects
759
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2023

March 31, 2023

img_map_placeholder

25300 Sherwood Ave, Center Line, MI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Memorial Field Parking Lot and Signage

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.