This is a service / maintenance or supply contract in Oklahoma City, Oklahoma. Contact the soliciting agency for additional information.
3 Year Switchgear Maintenance Department of Veterans Affairs (VA) Veterans Health Administration (VHA) Oklahoma City VA Health Care System BRIEF SCOPE OF WORK (This is for information only) PURPOSE: Oklahoma City VA Health Care system requires the contractor to provide required 3-year switchgear preventative maintenance inspection, and testing on all circuit breakers, in accordance with the Performance Work Statement (PWS), in an efficient and cost-effective manner, supporting the VA mission. This is a non-personal services contract. The Contractor, its employees, agents and subcontractors shall not be considered VA employees for any purpose of fulfilling the PWS and shall be considered employees of the Contractor. Contractor shall furnish all labor, materials, parts, equipment, tools, shipping, transportation, insurances, licenses, certifications and supervision necessary to provide services in accordance with this Performance Work Statement (PWS). For a contract of this size, scope and complexity, the successful Contractor must perform in a professional manner as recognized by commercial industry standards as good to excellent. TASKS and REQUIREMENTS: The switch gear is required to be serviced every 3 years for preventative maintenance. SWITCHGEAR: Clean, inspect, test and adjust all major electrical distribution equipment. This shall include the electrical distribution equipment and transformers in the following locations: See attached inventory list to be serviced. 1. Sub-Stations: No. 1, No. 2, No. 2.5, No. 3 & No. 4. 2. Animal Research Facility. Execute work to interfere as little as possible with normal functioning of the medical center. All outages shall be scheduled and approved in writing at least two weeks in advance. REPORT: A. The contractor shall provide a complete comprehensive report on the results of the services rendered. The report shall provide for listings of all equipment tested and scanned including complete nameplate data, age, maximum loading in amperes, the conduction as found, and modifications made. In addition, the contractor shall make recommendations including any major defects or deviations in the electrical system detected during the test and inspection and any violations of national or local codes that may affect the safety of personnel and/or continuity of service. Complete a check- list for each piece of equipment. The check- list shall have a line item for each test and inspection to be performed. All critical conditions, including recommendations for corrective action shall be submitted in writing. INSPECTION, TEST, MAINTENANCE AND REPAIR: Testing shall be performed in compliance with applicable NEMA, ANSI, ASTM, ASA, NFPA and VA standards. The following equipment shall be inspected, tested and/or repaired in this project: ENCLOSURES AND CUBICLES: The inside of the enclosures housing electrical switchgear shall be cleaned with a vacuum cleaner with insulated attachments. Keep generally free from dust, lint, dirt, and abrasive material. Clean all buses, supports, etc. Buses and connections should be inspected for signs of overheating and weakening of insulation. Buses shall be inspected for adequate support spacing and bracing in accordance with the NEMA Standards for bus bar bracing. All structure supports will be checked for Tracking and anchor bolts will be checked for tightness. All control connections, screws, lug, bolts, solderless connectors, etc. will be checked for tightness to ensure good electrical continuity and mechanical condition. Inspect the ground for a solid, continuous, and adequate ground. The connections shall be cleaned and tightened. All raceway systems entering the switchboard shall be inspected to determine that they are properly bonded with lock nuts, etc. Service entrance equipment shall be checked to see that it is grounded in accordance with current NEC requirements. All switch gear compartments shall have the backs removed to allow complete cleaning. All front compartments shall be cleaned and lubricated as necessary, following manufacturer specifications. CIRCUIT BREAKERS: Electrical test shall be made on all circuit breakers by subjecting them to actual operating current to ensure that they will operate within the same limits after service as when new. Adjustments shall not be attempted by anyone other than trained service personnel having the necessary tools and test equipment. The breaker shall be beggared at no greater than 10 percent of its rated voltage. The megger readings must be taken with the breaker closed and latched. Megger readings must be taken from each pole to the breaker frame and from each pole to each of the other poles. The interlock mechanisms should be inspected and tested to ascertain that they are functioning as designed. On a breaker with a 240-volt control, the minimum Megger reading should be one meg-ohm. All circuit breakers shall be removed from service and inspected for loose, broken, or defective parts. All current contacts shall be inspected, cleaned, and polished as required. All bolts, cutter pins, rollers, and bearings shall be examined to determine if any defect, looseness, or unusual conditions exist. All linkages shall be examined and lubricated as required. All arc chutes, barriers and insulation shall be examined for broken or burned areas. All parts shall be cleaned as required. The circuit breaker shall be reassembled. The circuit breaker shall then be tested for electrical tripping using approved low voltage, high current test equipment or trip tested by stimulated CT current through the time over-current relay devices in accordance with the manufacturer s specifications and published standards. No change in trip device setting from as found shall be made by the contractor without expressed approval. SWITCHES-DISCONNECT, TRANSFER SWITCHES, SWITCHGEAR, ATS S AND GENERATOR SWITCHGEAR: Where possible, the main contacts of the switch can be cleaned, adjusted and a thin film of lubricant placed on them. The fuse clips, connections to the bus or cable, mounting in switchboard, and handles shall be checked for tightness and proper alignment. When applicable, the tension on the contacts may be checked with signs of -discoloration caused by heating are noted. After exercising the switch several times, cleaning and making any adjustments necessary, with a conductor test set, the resistance drop across each phase shall be measured. If the drop has greater than + 20% variation between phases, part replacement should be recommended. Generator switchgear, where possible, shall meet -maintenance requirements per manufacturer s specifications. RELAYS: Relays shall be checked with a current and accurate timing device. If a relay does not give the desired operating time for a given current, the desired time can usually be obtained by cleaning and adjustment. Only qualified personnel, properly trained and properly equipped with test equipment, manufacturer s data, and necessary special tools, should work on this equipment. INFRARED SURVEY: Thermo-vision equipment shall be utilized to scan all electrical equipment and terminations in the locations previously specified. All hot spot , those which measure greater than 8 degrees (Celsius) higher than die reference temperature (ambient) shall be photographically recorded and included in the Engineering Report to be submitted. The areas adjacent to the proposed addition shall be continuously occupied by the OKC VAMC. The Contractor shall implement phasing to ensure that the construction will not impact or impede the VAMC s mission to care to the Veterans. The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses. Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, NFPA 101, NFPA 70, Lock-out-Tag-out, and Rules of Station. The C&A requirements do not apply, and that a Security Accreditation Package is not required. IMPORTANT NOTE: This Sources Sought is for information only (to determine the socioeconomic status of interested companies). No award will be made off of this posting. LIMITATIONS OF SUBCONTRACTING: The Limitations of Subcontracting may or may not apply to a resulting solicitation from this Market Research. Vendors are advised to familiarize themselves with Federal Acquisition Regulation parts 19.505(a)(2) and 19.505(b)(1) as it pertains to subcontracting limitations. Vendors are also advised to familiarize themselves with 13 CFR 125.6 and the penalties described in this regulation. Please communicate via e-mail to frances.basham@va.gov by 10 a.m. 12/26/2022 as to your company s interest and ability to perform service per this brief Scope of Work. If interested, please provide the following: Please state your company s business size as related to NAICS code XXXXXX As per the Limitations of Subcontracting: (see FAR 19.505) As Primary Contractor: what % of Total Contract Value will you retain If using a Subcontractor: what % of Total Contract Value will go to them Please provide SAMs Unique Entity Identifier number If you have an FSS/GSA contract that includes this service Provide FSS/GSA contract number if applicable The method of contractor selection has not been determined at this time.
Conceptual
Medical
Public - Federal
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2023
921 NE 13th St, Oklahoma City, OK
Related To This Project
Oklahoma City, OK
Bid Date: Aug 17 2022
Oklahoma City, OK
Bid Date: Jul 01 2022
Oklahoma City, OK
Bid Date: May 25 2022
Oklahoma City, OK
Bid Date: Jun 24 2022
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Aug 18 2022
Oklahoma City, OK
Bid Date: Aug 18 2022
Oklahoma City, OK
Bid Date: Aug 18 2022
Oklahoma City, OK
Bid Date: Jan 18 2023
Oklahoma City, OK
Bid Date: Jan 25 2023
Oklahoma City, OK
Bid Date: Jun 13 2023
Oklahoma City, OK
Bid Date: Jan 25 2023
Oklahoma City, OK
Bid Date: Jan 12 2023
Oklahoma City, OK
Bid Date: Jun 23 2022
Oklahoma City, OK
Bid Date: Jul 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.