BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a fire / police facility in San Marcos, California. Working plans call for the renovation of a fire / police facility.

The work generally consists of upgrading existing HVAC system at Fire Station 1. A detailed Scope of Work can be found in the IFB Documents. An authorized representative must attend the pre-bid conference and sign the attendance sheet. For bidders partnering on the project, an authorized representative from one of the partners must attend and sign the attendance sheet. Prevailing wage notice is hereby given that, payment of prevailing wages and compliance with the California Labor Code Sections 1770 et seq is required for this project. The Contractor will be required to comply with all of the terms and conditions (including State General Prevailing Wage requirements) prescribed for Contractor performing public works construction projects. The Contractor shall possess at the time the contract is awarded, a California Contractors license classification C-20 - Warm-Air Heating, Ventilating and Air-Conditioning Contractor. All work shall be completed to the satisfaction of the Agency in conformance with the Contract Documents within forty-five (45) Working Days after the date of commencement specified in the Notice to Proceed. Liquidated damages: The Contractor shall pay the City the sum of $1,500.00 per day, for each and every calendar working day's delay in excess of the number of working days prescribed above. The company to whom the Contract is awarded, and any subcontractor under such company, shall hereby ensure that minority and women business enterprises will be afforded full opportunity to submit bids for subcontracts. Further, there shall be no discrimination in employment practices on the basis of race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, age, or sex. Each bid must be accompanied by bidders security equal to 10 percent of the bid.

Final Planning

Fire / Police

$275,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
97
Bidding Soon
2,207
All Active Projects
992
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2023

June 1, 2023

img_map_placeholder

180 W Mission Rd, San Marcos, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.