BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Miramar, Florida. Completed plans call for site work for a road / highway.

The City of Miramar Public Works Department is inviting qualified Asphalt Contractors to submit quotes to modify two (2) speed humps on asphalt roads within the City of Miramar. Each hump spans across 2 lanes of traffic which is 22ft wide. Quote shall include labor, materials, equipment, supervision, insurance, maintenance of traffic, and all incidentals to perform the Work completely. The humps to be modified are at 9351 and 9451 Dunhill Drive The Successful Contractor shall provide all equipment, labor, and materials necessary to modify two (2) existing traffic calming speed humps. Work will include saw cutting of both ends of the speed humps, milling 1 inch of asphalt and reinstalling 1 inch of asphalt at the sawcut and transition to 1.5 inches at the break point to the flat top of the hump. Break points shall be sharp, and the top of the humps shall be flat. One foot (1') solid white thermoplastic arrows must be used to mark the speed humps, and three (3) reflective pavement markers (rpm) on each side facing traffic. All work must be done in strict compliance with the drawings and specifications illustrated below. Twelve 12 standard delineators to be placed, three (3) per side of each speed hump. The delineators must be performance level flexible, white colored with reflective sheeting, and stand at thirty-six inches (36"). They must be bolted and caulked per manufactures specifications. The City reserves the right to reject any or all bids/proposals, to waive any informality in a bid/proposal and/or in the bidding/selection process, and to make awards, if awarded, to the lowest responsive, responsible bidder/offeror as deemed in the best interest of the City. The work shall commence ONLY after the contractor has been notified by the Public Works Department but within five (5) business days after receipt of purchase order. The work shall be completed within thirty (30) days from the date of commencement

Award

Roads / Highways

$16,573.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
50
Bidding Soon
1,102
All Active Projects
496
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2023

February 3, 2023

img_map_placeholder

Dunhill Dr, Miramar, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.