BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Castle Rock, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Job Location Town of Castle Rock Question Acceptance Deadline 01/11/2023 06:30 PM EST Questions are submitted online No General Description - The work to be performed under this contract includes removal & replacement of asphalt mat, heating & scarifying, milling of asphalt pavement, asphalt pavement overlay, Full Depth Reclamation and the application of Seal Coat (GSB 88), crack seal, mastic. The removal & replacement of sidewalk, curb & gutter, and concrete pavement and silicone sealant. The Contractor shall supply all labor, equipment, and materials necessary to complete the work in accordance with these specifications. The contractor shall adhere to the Town's Temporary Erosion and Sediment Control (TESC) manual for all stages of the project. The contract shall be awarded based on bids received and the contract documents. A schedule of sequencing of all work shall be submitted at or before the project pre-construction meeting, and approved by the Town prior to issuance of Notice to Proceed. "Founder's Fire Station #153" Concrete work and asphalt full depth reconstruction shall be completed in a manner to maximize access and parking and shall take place during normal weekdays from 7a.m. - 5p.m. Asphalt paving and concrete pavement removal & replacement shall be completed in two (2) phases, asphalt paving and concrete work shall not take place simultaneously. All work must be coordinated with Fire Department staff. "Prairie Hawk Fire Station #154" Concrete work and asphalt milling shall be completed in a manner to maximize access and parking and shall take place during normal weekdays from 7a.m. - 5p.m. Asphalt paving and concrete pavement removal & replacement shall be completed in two (2) phases, asphalt paving and concrete work shall not take place simultaneously. All work must be coordinated with Fire Department staff. "Ray Waterman Treatment Plant" work shall take place during normal weekdays from 7a.m. - 5p.m. Concrete repairs, mastic, crack seal, and asphalt patching work and seal coat, shall be completed in two (2) phases, one (1) phase per day or as approved by the Project Manager to maximize access and parking to Treatment Plant Staff. All work shall be coordinated with Castle Rock Water Department staff. "Founder's Treatment Plant" " work shall take place during normal weekdays from 7a.m. - 5p.m. Concrete work, mastic, crack seal, and asphalt patching shall be completed in a manner to maximize access and parking. Seal coat shall be completed in one (1) phase per day or as approved by the Project Manager. All work shall be coordinated with Castle Rock Water Department staff. "Weaver II Well Field" work shall take place during normal weekdays from 7a.m. - 5p.m. Concrete work, mastic, crack seal, and asphalt patching shall be completed in a manner to maximize access and parking. Seal coat shall be completed in two (2) phases, one (1) phase per day or as approved by the Project Manager. All work shall be coordinated with Castle Rock Water Department staff. "Wrangler Parking Lot" Concrete work and asphalt patching shall be completed in a manner to maximize access and parking work and shall take place during normal weekdays from 7a.m. - 5p.m. Seal coat shall be completed in two (2) phases, one (1) phase per day or as approved by the Project Manager. All work shall be coordinated with Parks and Recreation Department staff. "Bison Park Parking Lot" work shall take place during normal weekdays from 7a.m. - 5p.m. The work to be performed under this contract includes removal and replacement of existing concrete including concrete pavement, crosspan, sidewalk, curb and gutter, curb ramps, asphalt patching, various depths and types of milling of existing asphalt pavement, and various thicknesses of asphalt paving within the parking lot listed in the Appendices or as directed by the Project Manager. All work shall be coordinated with Parks and Recreation Department staff. "Gemstone Park Parking Lot" work shall take place during normal weekdays from 7a.m. - 5p.m. Concrete work and asphalt shall be completed in a manner to maximize access and parking. Perform full depth reclamation, and various thicknesses of asphalt paving within the parking lot listed. All work shall be coordinated with Parks and Recreation Department staff. "Butterfield Park (Concrete off Meadows Blvd)" work shall take place during normal weekdays from 7a.m. - 5p.m. Concrete curb, gutter, and pavement work shall be completed in a manner to maximize access and parking. All work shall be coordinated with Parks and Recreation Department staff. The contractor shall commence work no later than three (3) calendar days from, and including, the date of the Notice to Proceed, and be construction complete (punchlist items, cleanup, and demobilize) within thirtyfive (45) working days from the date on the Notice to Proceed. All work shall take place during the timeframe of September 5, 2023 - November 3, 2023. General Requirements - Bidder Prequalification/Preregistration Required - Bid Deposit Required - Insurance Required

Award

Sidewalks / Parking Lot

$731,060.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
102
Bidding Soon
1,536
All Active Projects
657
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 19, 2023

September 5, 2023

November 3, 2023

img_map_placeholder

Multiple Locations, Castle Rock, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.