BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Roseville, California. Contact the soliciting agency for additional information.

The City of Roseville is soliciting proposals for Piping Integrity Management Consultation and Inspection services for Roseville Electric Generation's Risk-Based Integrity Management (RBIM) program. This will be a competitive negotiation process. Qualified individuals, firms, contractors, consultants or entities, that meet the requirements set forth in this Request for Proposals and are capable of providing the services requested are encouraged to participate. Attendance will be taken at the beginning of the conference. Proposals from Consultants who do not attend the mandatory pre-proposal conference will be rejected. The pre-proposal conference will begin at the designated start time. Attendance for the entire pre-proposal conference is required. Vendor attendance is required. The City is not responsible for misdelivered proposals, and the proposer is strictly liable for its chosen method of delivery. It is the proposer's sole responsibility to make sure that proposals arrive at the proper location. Any proposal which does not actually arrive in the City Clerk's Office by the RFP due date and time will be rejected as non-responsive, even if properly addressed or delivered to another City Department. Direct all inquiries regarding this RFP in writing to Michael Zasso by accessing the RFP from the City electronically, by no later than 01/12/2023 by 5:00pm PST. Commencement of Services - TBD, expected April 2023 The initial contract will be from date of award through a period of five (5) years. The Consultant receiving the contract award for the initial contract will retain that contract award throughout the life of the contract. The method of Contractor Selection has not been Determined at this time.

Conceptual

Pipeline

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
71
Bidding Soon
1,321
All Active Projects
550
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.