Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 28, 2023 at 7:00 PM
Updated January 26, 2024
Site work and paving for a mixed-use development in Liberty, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Construction, Concrete/Formed/Flatwork/Foundation, Concrete Walkway, Concrete Pavement, Sawcutting/Sidewalk/Pavement, ADA Curb Ramps, Curbs, Concrete Pavement Removal, Concrete Repair The Project consists of Concrete curb and gutter removal and replacement, Concrete sidewalk removal and replacement, ADA ramp removal and replacement, Concrete cross pan construction, asphalt pavement milling and overlay, full depth concrete pavement removal and replacement and Concrete Driveway replacement. Bid Bond: 5% Performance Bond: 100% Payment Bond: 100% Completion Date: Contractor shall complete the work in accordance with the contract documents between the dates of February 28, 2023 and July 28, 2023. City shall be notified of the start date a minimum of three weeks prior to the start date of construction. Parts of the Work shall be substantially or final completed on or before the following Milestone(s): 1. Milestone 1 - First Priority Areas. Replacements and restorations are required to be completed by May 5, 2023. The goal of this milestone is to have concrete replacement completed to allow for asphalt resurfacing of these streets in 2023 starting May 8, 2023. 2. Milestone 2 - Second Priority Areas. Replacements and restorations are required to be completed by July 28, 2023. 3. Milestone 3 - Restoration of Yards. Yards disrupted during construction must be restored within 14-week days of the disruption.
Award
Roads / Highways
$288,617.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
19
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 1, 2023
February 28, 2023
Multiple Locations, Liberty, MO
Related To This Project
Liberty, MO
Bid Date: Feb 02 2023
Liberty, MO
--
Liberty, MO
Bid Date: Feb 09 2023
Liberty, MO
Bid Date: Feb 09 2023
Liberty, MO
Bid Date: Mar 09 2023
Liberty, MO
Bid Date: Mar 15 2023
Liberty, MO
--
Liberty, MO
--
Liberty, MO
Bid Date: Sep 28 2022
Liberty, MO
Bid Date: Jul 07 2022
Liberty, MO
Bid Date: Feb 19 2021
Liberty, MO
Bid Date: Sep 01 2021
Liberty, MO
Bid Date: Sep 02 2022
Liberty, MO
Bid Date: Sep 02 2022
Liberty, MO
Bid Date: Sep 09 2021
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed