BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction and renovation of a civil project in Chetek, Wisconsin. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; for the demolition of a water / sewer project; and for the construction of a water / sewer project.

The project entails the furnishing of all labor and material for the construction of a wastewater treatment facility. Major components of the Work include: main lift station, mile force main, headworks/control building with grit removal, preselected Sequencing Batch Reactor (SBR), aerobic digester, UV/filter building, preselected Continuous Backwash Sand Filter (CBSF), chemical storage building, grit drying bed, site work, lab equipment, electrical/SCADA, HVAC, process piping and demolition of existing wastewater treatment plant. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder in accordance with the Instructions to Bidders. The City of Chetek reserves the right to retain the deposits of the three (3) lowest bidders for a period not to exceed 30 days after the date and time set for the opening of bids. No bids may be withdrawn for a period of 30 Days after the date and time set for the opening of bids. Bidders Proof of Responsibility must be submitted in accordance with the Instructions to Bidders. Bidders will be required to provide performance and payment bonds of 100 percent of bid amount. This Contract is expected to be funded in part with funds provided by the United States Department of Agriculture, Rural Utilities Service (RUS). Information on applicable federal requirements is contained in the Project Manual. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term iron and steel products means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The following waivers apply to this Contract: De Minimis, Minor Components, Pig iron and direct reduced iron, and project specific waivers: TBD. The Owner encourages DBEs, MBEs, WBEs, and SBRAs to submit Bid proposals. Equal Opportunity and Affirmative Action requirements apply to this Project. The Offerors or Bidders attention is called to the Equal Opportunity Clause and the Standard Federal Equal Employment Opportunity Construction Contract Specification included in the specifications. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractors aggregate workforce in each trade on all construction work in the covered area, are as follows: Goals for minority participation for each trade = 0.6% (Barron County) Goals for female participation in each trade = 6.9 % The City of Chetek reserves the right to reject any and all bids, without cause, to waive irregularities and informalities therein and to award the Contract in the best interest of the City of Chetek.

Bid Results

Water / Sewer

$19,942,000.00

Public - City

Demolition, New Construction, Renovation, Site Work

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
29
Bidding Soon
475
All Active Projects
189
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2023

September 1, 2023

img_map_placeholder

210 Water St, Chetek, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.