BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Kingsland, Georgia. Contact the soliciting agency for additional information.

The City of Kingsland, Georgia will accept qualifications and sealed price proposals from firms wishing to provide professional services for the Management, Operations, and Maintenance of the Citys potable water treatment facility, wells, and associated infrastructure to include all required testing, monitoring, and reporting. State of Georgia Department of Natural Resources Environmental Protection Division (DNR/EPD) Permit #CG0390000. The City of Kingsland, Georgia requests Statements of Qualifications and Cost Proposals from firms wishing to provide professional O&M services for the Citys potable water treatment facility, wells, and associated infrastructure for a contract period of 2 years; with an option to renew annually thereafter. Facilities include: Kingsland Water Plant #1 595 S. Grove Boulevard Kingsland, GA 31548 Deep Well #1 - 860 ft. deep Deep Well #2 - 820 ft. deep 150,000-gallon glass fused steel clear well, constructed in 2022 2 down draft aerators constructed and installed in 2022 Liquid chlorine injection systems 150,000 Elevated Water Storage Tank Kingsland Water Plant #2 358 East Colerain Road Kingsland, GA 31548 Deep Well #3 - 720 feet deep Deep Well #4 - 720 feet deep 125,000-gallon concrete clear well, constructed in 1996 (refurbished 2021) Liquid chlorine injection systems 162 Gross Road Kingsland, GA 31548 500,000-gallon Elevated Water Storage Tank 261 EMS Tower Road Kingsland, GA 31548 500,000-gallon Elevated Water Storage Tank The water source for these wells is commonly called the Upper Floridan Aquifer. The property surrounding these wells is protected from activities that could potentially cause contamination of the water source. Treatment of the water is performed at the well sites including removal of contaminants and sodium hypochlorite disinfection. To ensure continuity of essential services, the successful contractor shall be prepared to fully commence work upon Notice to Proceed by the City and should not assume that the previous employees and/or contractor will be available to guide, direct or specifically orientate each new Contractor employee. By signing the letter, the Respondent certifies that he/she is authorized to bind the Respondent. The RFQ response should include: A brief statement of the Respondents understanding of the scope of the work to be performed; A confirmation that the Respondent meets the appropriate State licensing requirements to perform the necessary services; A confirmation that the Respondent has been in business for at least five years; A confirmation that the Respondent has successfully held at least one five year contract for a system of comparable size and complexity; A confirmation that the Respondent has not had a record of substandard work within the last five years; A confirmation that the Respondent has not engaged in any unethical practices within the last five years; A confirmation that, if awarded the contract, the Respondent acknowledges its complete responsibility for the entire contract; Any other information that the Respondent feels appropriate; The signature of an individual who is authorized to provide information of this nature in the name of the Respondent submitting the RFQ response. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
52
Bidding Soon
959
All Active Projects
393
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 31, 2023

img_map_placeholder

Multiple Locations, Kingsland, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.