BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Solon, Ohio. Contact the soliciting agency for additional information.

Solon High School Natatorium Locker Room HVAC Units Replacement Project It is understood and agreed that work embodied in this Contract for the Base Bids and Alternates as awarded shall start on or about June 5, 2023, and be completed no later than August 4, 2023, unless an extension of time is granted by the Owner. A fee of $1,000.00 per day may be charged for work not completed by August 4, 2023. In addition, the Contractor can be billed $110.00/hr. for all Consulting hours that result, as a result of work not completed by August 4, 2023. These Consulting hours may be deducted from the Prime Contractor's contract balance. Each bid must contain the full name of every person or company interested in the same, shall state the price for labor and materials, and must be accompanied by a BID GUARANTEE meeting the requirements of Section 153.571 and 153.54 of the Ohio Revised Code. Each bidder must ensure that all employees and applicants for employment are not discriminated against because of their race, creed, color, sex or national origin. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. This project will be subject to Federal Prevailing Wage Rates.The Bidder will need to certify that upon the execution of the Contract, the Contractor shall be enrolled in good standing in the Ohio Bureau of Workers' Compensation Drug-Free Workplace Program (DFWP) or an equivalent BWC approved DFWP throughout the entire Project, in accordance with Ohio Revised Code Sections 153.03 to 153.031. The Bidder acknowledges the responsibility to require all Subcontractors to be enrolled in good standing in the Ohio Bureau of Workers' Compensation DFWP or comparable Bureau of Workers' Compensation approved program that meets the requirements specified in Ohio Revised Code Sections 153.03 to 153.031, prior to the Subcontractor providing labor at the Project site. If in the opinion of the Owner, the acceptance of the lowest responsible bid is not in the best interest of all concerned, the Owner may accept another proposal so opened or reject all proposals and advertise for other bids. The Owner reserves the right to waive any informality or to reject any or all bids.

Post-Bid

Educational

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
63
Bidding Soon
979
All Active Projects
390
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.