BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Easthampton, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

. Work consists of RRFB installation, curbing, concrete sidewalk, drainage structures, reclamation, milling and paving and related work. The City of Easthampton reserves the right to waive any informality in the proposal form and to reject any or all proposals, or to accept the proposal deemed most acceptable to the City, if it is in the public interest to do so. The work involved in this Contract includes, but is not limited to: 1. Pavement milling, leveling, and paving of Holyoke Street from Cottage Street to Allen Street. (Holyoke St Paving, Base Bid) 2. Reclamation of pavement and paving of Truehart Drive (Add Alternate 1) and Wemelco Way (Add Alternate 2). 3. Constructing intersection and pedestrian improvements at the intersection of and pedestrian improvements at the intersections of Holyoke Street and East/West Green Street and Holyoke Street and Allen Street. This work includes unclassified excavation, new construction and reconstruction of sidewalks, construction of cement pedestrian curb ramps, granite curb, pavement markings, new stop signs and street name signs, the installation of a Rectangular Rapid Flashing Beacon systems at each intersection. (Holyoke St Intersections, Base Bid) 4. Installation of new frames, covers, grates, water boxes, adjustment of frames and valve boxes, the restoration of the tree belts with loam and seed adjacent to work, installation and removal of safety controls, and any other work necessary to complete the work on Holyoke Street, Wemelco Way, and Truehart Drive. (All) Prospective bidders are required to submit all questions to the City by 3:00 P.M. on the Thursday before the scheduled bid opening date. Any questions received after this time will not be considered for review by the City. All questions must be in writing and are due by 5:00PM on Wednesday, January 11, 2023. There will be no preconstruction conference for this project. The Commonwealth of Massachusetts has established minimum wage rates for this project. A prevailing wage rate schedule will be included in the bidding document. MassDOT prequalification of contractors with the class of work as, HIGHWAY CONSTRUCTION, for the project with an estimated value of $1,247,250.75 will be required. Pavement milling, leveling, and paving of Holyoke Street from Cottage Street to Allen Street. (Holyoke St Paving, Base Bid) Reclamation of pavement and paving of Truehart Drive (Add Alternate 1) and Wemelco Way (Add Alternate 2)

Bid Results

Roads / Highways

$637,651.00

Public - City

Paving, Site Work

18

14

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
533
Active Projects
315
Bidding Soon
4,246
All Active Projects
1,778
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 25, 2023

March 27, 2023

November 30, 2023

img_map_placeholder

Multiple Locations, Easthampton, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.