Published March 21, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Bedford, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project provides for the asphalt resurfacing and concrete median barrier replacement of the Pennsylvania Turnpike Breezewood Connector from Milepost C-0.0 to Milepost C-1.54. The project involves asphalt milling, asphalt wearing course pavement, shoulder reconstruction, rock armor, pavement removal, embankment slope repairs, drainage improvements, concrete glare screen, single-face concrete barrier, moment slab with single-face barrier, guide rail, signing and pavement markings along the entirety of or localized areas within the project limits. Work also includes maintenance and protection of traffic Work items include, but are not limited to: 4,988 CY Excavation, Various Types 3,014 SF Geosynthetic Reinforced Soil Slope, Type D 10,607 TON Superpave Asphalt Mixture Design, Various Courses 2,483 TON Subbase (No. 2A) 69,382 SY Milling of Asphalt Pavement, 2" Depth 8,927 LF Remove Existing Guide Rail 6,150 LF Type 31-S Guide Rail 4,570 LF Remove Concrete Median Barrier, 34" 446 LF Single Face Concrete Barrier, 52" 5,320 LF Concrete Median Barrier, F-Shape, 50" Height 2,561 LF Asphalt Concrete Curb 12,198 EA Sonic Nap Alert Pattern (S.N.A.P.) 3,713 SY Shoulder Backup 412 LF Rock Armor 462 CY Rock Armor, Modified 37,318 LF Permanent Preformed Patterned Reflective Pavement Markings This project is located on the Breezewood Connector of the Pennsylvania Turnpike between Milepost C0.0 at the Breezewood Interchange Toll Plaza, Exit 161, and Milepost C-1.54 situated approximately 1.5 miles east of the Breezewood Interchange, Exit 161, at the US 30 Interchange in Bedford County, Pennsylvania. An electronic bid bond, from an approved vendor, with corporate surety, in the amount of five (5%) percent of the bid must be submitted with the proposal as bid security. The bid security of the three (3) low bidders will be retained until the execution of the contract. (The normal time for execution of the contract is approximately four [4] weeks.) A Prequalification Certification and Applicable Capacity Rating assigned by the Prequalification Office of the Pennsylvania Department of Transportation is a necessary prerequisite for bidding on this project. The opening and listing of bids not meeting all the terms and conditions of the bid advertisement or bid procedures does not act as a waiver or modification of any requirements contained in the bid advertisement or bid procedure. The Provisions of the Pennsylvania Prevailing Wage Act of August 15, 1961, P.L. 987, as amended, together with the rates and regulations promulgated by the Secretary of Labor and Industry applicable thereto, shall apply to this contract. Any questions for this project must be submitted electronically in EBS by registered business partners.

Award

Roads / Highways

$10,161,000.00

Public - State/Provincial

Paving, Site Work

90

7

24

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
84
Bidding Soon
1,099
All Active Projects
467
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2023

February 24, 2023

img_map_placeholder

Multiple Locations, Bedford, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Asphalt Resurfacing & Concrete Median Barrier Replacement Of Breezewood Connector In Bedford County

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.