BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Moreno Valley, California. Contact the soliciting agency for additional information.

The City of Moreno Valley is the second largest City in Riverside County with a population of approximately 215,000. As the City continues to grow and attract more employers and industry, there is an immediate need to incentivize clean energy solutions to improve poor air quality currently experienced by residents. For example, 100% of census tracts within the City experience average ozone levels of 0.065 ppm or higher, placing them within the top 98th percentile of ozone levels statewide. The City has a high proportion of residents living in disadvantaged communities (DACs), with 22 out of 43 census tracts (51%) qualifying as DACs per SB 535 by scoring within the top 25th percentile of CalEnviroScreen 3.0. In addition, over 54% of census tracts within the City scored within the lowest quartile on the Healthy Places Index (HPI), meaning these areas have less healthy conditions than 75% of all census tracts statewide. Moreover, 100% of census tracts within the City scored within either the lowest or second lowest quartile on the HPI. See Appendices for maps and data. In an effort to combat these alarming trends, the City seeks to leverage the comprehensive community engagement recently completed as part of Moreno Valley's Climate Action Plan (CAP) and the strategies identified in the Moreno Valley Utility's Transportation Electrification Roadmap to develop an Electric Vehicle (EV) Charging Infrastructure Master Plan that provides a comprehensive, systematic approach to building a public accessible EV infrastructure network to safely facilitate the movement of electric vehicles within the City and surrounding areas. The Master Plan includes the following key tasks, which are further outlined in subsequent sections of the scope of work: Analyze and document existing conditions, including current plans and policies, transportation network, public and private land uses, disadvantaged communities, and existing EV charging infrastructure. Perform a feasibility analysis that identifies EV trends and needs, available technologies, infrastructure requirements and costs, socioeconomic challenges and barriers, rebate and incentive programs, marketing strategies, and opportunities for public-private partnerships. Complete a siting analysis that utilizes regional travel data, land parcel data, existing EV charging station locations, vehicle registration data and site-specific factors to identify high-impact project locations for EV charging infrastructure investment. Develop a community outreach, awareness and engagement plan that prioritizes the mobility needs of disadvantaged communities within the City and highlights the environmental and economic benefits of driving electric vehicles. Explore a combination of ownership, including public, private, and public-private. Provide a phasing plan for implementation. The project is different from the Moreno Valley Utility Transportation Electrification Roadmap (MVUTER) in that this project will provide a specific plan to build an EV infrastructure network. On the other hand, the purpose of the MVUTER is to find the specific needs and requirements of the utility and the required actions to meet those needs for the utility agency. For example, the MVUTER, goes over PEV infrastructure incentives and consumer awareness. The project is built upon the roadmap in that it aligns with the goals of increasing PEV charging infrastructure within the City of Moreno Valley. This project will support implementation of the City's Climate Action Plan (CAP) by increasing the locations of electrical vehicle charging areas-thereby making it easier to access with more convenient charging locations available. In turn, this will encourage sales of more electric vehicles and thereby be in alignment with the City's CAP to reduce greenhouse gas (GHG) emissions and meet or exceed mandated targets. Other Details The bidder is solely responsible for on time submission of their electronic bid. The City will only consider bids that have been transmitted successfully and have been issued an ebid confirmation number with a time stamp from the Bid Management System indicating that the bid was submitted successfully. Transmission of bids by any other means will not be accepted. Bidder shall be solely responsible for informing itself with respect to the proper utilization of the bid management system, for ensuring the capability of their computer system to upload the required documents, and for the stability of their internet service. Failure of the bidder to successfully submit an electronic bid shall be at the bidder's sole risk and no relief will be given for late and/or improperly submitted bids. Bidders experiencing any technical difficulties with the bid submission process may contact PlanetBids at (818) 992-1771. Neither the City, nor PlanetBids, makes any guarantee as to the timely availability of assistance, or assurance that any given problem will be resolved by the bid submission deadline. Q&A Deadline 01/07/2023 5:00 PM (PST)

Conceptual

Service Station / Car Wash

$230,000.00

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
98
Bidding Soon
2,211
All Active Projects
997
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2023

img_map_placeholder

Multiple Locations, Moreno Valley, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.