Published April 28, 2023 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a civil project in Mechanicsburg, Pennsylvania. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Project Award Contract 1 – General Construction to PSI Pumping Solutions, Inc. in the amount of $1,195,700.00, and Contract 2 – Electrical Construction to WYElectric, LLC in the amount of $120,000.00. The work includes all material, labor, and equipment necessary for the demolition of the existing lime silo, roofing system and building walls, including new exterior wall, roof, doors, digester blowers and plant utility water system. Additional work items include mechanical equipment installation and startup. The project is located in Upper Allen Township, Cumberland County. The work includes all material, labor, and equipment necessary for the demolition of the existing lime silo, roofing system and building walls, including new exterior wall, roof, doors, digester blowers and plant utility water system. Additional work items include mechanical equipment installation and startup. The project is located in Upper Allen Township, Cumberland County. CLARIFICATION DEADLINE 1/25/2023 3:00 PM All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing through PennBid by clicking on the "Questions" tab. The Project consists of the installation of new piping and valves, and other water system modifications, as outlined in these Drawings, Technical Specifications, General Conditions, Specific Conditions and/or Bid Documents. 1. Project Location: 400 Creekside Drive, Mechanicsburg, PA 17055 2. Owner: Upper Allen Township 100 Gettysburg Pike, Mechanicsburg, PA 17055 3. Engineer: GHD 225 Grandview Avenue, Suite 403, Camp Hill, Pennsylvania 17011 Major elements of the Work include the following: 1. Demolition of the existing lime silo, portions of the roof, building walls. 2. New Building enclosure work - walls, roof, roll-up door. 3. Blower and utility water demolition. 4. Electrical Demolition and new electrical work installation. The work includes all material, labor, and equipment necessary for the demolition of the existing lime silo, roofing system and building walls, including new exterior wall, roof, doors, digester blowers and plant utility water system. Additional work items include mechanical equipment installation and startup. The project is located in Upper Allen Township, Cumberland County.

Award

Water / Sewer

$1,315,700.00

Public - City

Renovation, Site Work

53

60

9

8

Subscribe For Documents

112 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Anchors, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Pipe and Tube Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Hardware, Door Hardware, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Ceilings, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, General Service Compressed-Air Systems, General Service Packaged Air Compressors and Receivers, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures, Pool and Fountain Plumbing Systems
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Excavation and Fill, Dewatering, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Planting, Turf and Grasses, Plugging
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
98
Bidding Soon
1,372
All Active Projects
614
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2023

May 23, 2023

img_map_placeholder

400 Creekside Dr, Mechanicsburg, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Grantham Wastewater Treatment Plant Dewatering System Upgrade

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.