BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Donalda, Alberta. Completed plans call for site work for a bridge / tunnel.

Bridgerail Rehabilitation, Concrete Repairs and Other Work 53:12 BF 1062 Carrying Hwy 53 over Battle River near Donalda kilometre 0.032 to 0.032 (EBL,WBL) Central Region APPROXIMATE QUANTITIES: 1 lump sum Existing Bridgerail - Remove and Dispose 260 metres Existing Guardrail - Remove and Dispose 1 lump sum Bridgerail Posts Supply and Install 1 lump sum Approach Rail Transitions Supply and Install 1 lump sum Guardrail Supply and Install 5 cubic metres Partial Depth Repair Contractor to supply all materials.

Award

Bridges / Tunnels

$514,700.00

Public - State/Provincial

Site Work

19

7

2

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
29
Bidding Soon
462
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2023

March 1, 2023

Project location map

Multiple Locations, Donalda, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.