EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 27, 2023 at 7:00 PM

Updated June 19, 2025

Site work for a water / sewer project in Bluffdale, Utah. Completed plans call for site work for a water / sewer project.

Installation of approximately 3,500 linear feet of 8-Inch PVC waterline along with fittings and appurtenances. Work also includes switching over existing water services, installation of new laterals, tying over existing fire hydrants, and full asphalt pavement restoration along with rotomill and overlay. All asphalt pavement must be restored within three weeks of pavement cut. Question Deadline 01/11/2023 at 1:00 PM MT 8-lnch C-900 PVC Waterline 8-lnch Gate Valve 8-lnch Bend 6"x6" TEE 8"x6" TEE New Pressurized Irrigation Lateral, Can, & Lid New 1-lnch Drinking Water Lateral Hot Mix Asphalt (HMA) -1/2 inch Mix, 3-inch thick PG64-28 Hot Mix Asphalt (HMA) -1/2 inch Mix, 2-inch thick PG64-28 Rotomill & Overlay

Award

Water / Sewer

$1,165,000.00

Public - City

Site Work

22

12

5

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Lath, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Fill, Backfill, Compaction
Division 33 - Utilities

Division 33 - Utilities

Water Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
30
Bidding Soon
611
All Active Projects
262
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2023

February 13, 2023

img_map_placeholder

Multiple Locations, Bluffdale, UT

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Fire Flow Deficiencies Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.