Published April 17, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Pine Grove, Pennsylvania. Completed plans call for site work for a water / sewer project.

As of March 15, 2023, the project has been awarded. A timeline for construction has not been confirmed. Questions must be submitted via PennBID Tuesday, February 7, 2023, until 12:00 PM prevailing time This Project is located along SR443 adjacent to Interstate I-81. The project includes the installation of 8" Ductile Iron pipe which includes a bore and jack under SR443 and a stream crossing and associated appurtenances. The particular items of work for the contract are identified more specifically in the Bid Documents. The entire project will be awarded to one (1) Contractor. A certified check or bank draft, payable to "Schuylkill County Municipal Authority" or satisfactory Bid Bond executed by the Bidder and acceptable Surety in the amount of 10 percent of the total bid shall be scanned and uploaded with each bid. THE SUCCESSFUL BIDDER will be required to furnish and pay for satisfactory Performance and Payment Bonds, each in the amount of one hundred percent (100%) of the Contract Price with a corporate surety approved by the Owner. Attention is called to the fact that no less than the minimum salaries and wages established under the PA State Wage Rates in the Contract Documents must be paid on this project and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, age, color, religion, sex, ancestry, national origin, or handicap. The Contractor will be required to comply with the Provisions of the Pennsylvania Human Relations Act in providing equal employment opportunities in connection with all work. This bid is for a public works contract and bidder is therefore subject to the provisions, duties, obligations, and penalties of the Public Works Employment Verification Act, 43 P.S. 167.1-167.11. All submitted bids shall be accompanied with the Public Works Employment Verification Form. The Owner reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by the Owner for a period not to exceed 60 days from the date of opening bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the contract. However, the award of the contracts may be delayed by required approval of another government agency or project funding. Owner shall reject all bids or award to the lowest responsive and responsible bidder within 120 days of the bid opening. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Water / Sewer

$672,095.00

Public - County

Site Work

19

36

32

10

Subscribe For Documents

83 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Procedures, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Exterior Insulation and Finish Systems, Steep Slope Roofing, Roof Tiles, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Electrical and Cathodic Protection, Facility Lightning Protection
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Maintenance of Earthwork, Maintenance of Earth Moving, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Flexible Paving, Asphalt Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
131
Bidding Soon
1,758
All Active Projects
821
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2023

May 1, 2023

img_map_placeholder

PA-443 & 2 1/2 Mile Rd, Pine Grove, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Pine Grove Waterline Extension Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.