BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Allentown, Pennsylvania. Completed plans call for site work for a water / sewer project.

CLARIFICATION DEADLINE 1/13/2023 5:00 PM For the Kline's Island WWTP Primary Digester No. 2 Cleaning project in accordance with the Contract Documents. Each Bid must be accompanied by Bid security in the form of a Bid Bond (in the required form) or certified check for ten percent of the Bid total. A Performance Bond and Labor and Material Payment Bond are also required prior to award of the Contract. This Project is subject to the provisions of the Commonwealth of Pennsylvania Prevailing Wage Act. See the Instructions to Bidders for additional information and requirements. It is a requirement of this Contract that Bidder shall have a minimum of (5) years' experience and at least (10) completed projects of similar nature to the Work required by this Project. The successful bidder will be required to furnish and pay for satisfactory Performance and Payment Bonds in an amount equal to one hundred percent (100%) of the contract price within fifteen (15) days after the contract has been awarded. Bids shall remain open for a period of sixty days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. See Instructions to Bidders for other provisions on the time available for acceptance of Bids. The Contract will be subject to the prevailing minimum wage determination established by the Department of Labor and Industry of the Commonwealth of Pennsylvania. The LEHIGH COUNTY AUTHORITY hereby reserves the right, which is understood and agreed to by all Bidders, to reject any or all Bids and to waive any omissions, errors, or irregularities in any Bid.

Award

Water / Sewer

$212,120.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
348
Active Projects
181
Bidding Soon
2,832
All Active Projects
1,370
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2023

April 1, 2023

img_map_placeholder

112 Union St, Allentown, PA


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.