BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Maplewood, Missouri. Completed plans call for site work for a water / sewer project.

Contract consists of the construction of approximately 50 lineal feet of 18-inch diameter pipe sewers and appurtenances to be constructed. The work under this Section shall include furnishing all labor, materials, tools, equipment, and performing operations necessary for the complete installation of noise and vibration isolation devices and systems as shown on the drawings and/or specified herein, to reduce noise and vibration to specified levels The types of vibration isolation work and sound control specified in this Section include the following items. Not all items will apply to every project. A. Vibration Isolation Hardware for Mechanical and Electrical Equipment. B. Inertia Base Frames and Structural Steel Bases used in conjunction with isolation hardware. C. Flexible Connections in Piping System. D. Vibration Hangers for certain equipment, piping, and ductwork. E. Sound Traps in ductwork. F. Isolation Systems for Roof Mounted Equipment. G. Noise Barrier Duct Wrap. H. Isolation Pipe Sleeves.

Bid Results

Water / Sewer

$789,397.00

Public - City

Site Work

4

3

2

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
136
Bidding Soon
1,281
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2023

February 6, 2023

Project location map

Multiple Locations, Maplewood, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.