Published January 17, 2025 at 7:00 PM

Updated January 18, 2025

Site work and paving for a road / highway in Lake Elmo, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Project includes pavement rehabilitation, including approximately 4,340 feet (0.82 miles) of commercial access frontage road and consisting of a Full-Depth Reclamation (FDR). From Jade Trail to the east property line of 9242 Hudson Boulevard, the roadway will be widened to accommodate a 3-lane section with a two-way continuous turn lane to accommodate the existing commercial driveway access spacing. The areas consisting of roadway widening and new turn lanes will include a full reconstruction consistent with the city standard pavement section for collector streets. The north side of Hudson Boulevard will be urbanized with new concrete curb and gutter, storm sewer, and a new 8-ft. bituminous trail to create a continuous trail from Inwood Avenue (CSAH 13) to Keats Avenue (CSAH 19). The Full Depth Pavement Reclamation (FDR) will include an 8-inch recycled aggregate base with a new 4-inch bituminous surface. Based on the testing performed and the in-place pavement layer thicknesses, there is sufficient material to perform FDR. The FDR approach provides a design life similar to that of reconstruction and is less expensive. It also disrupts crack patterns, reducing the potential for reflective cracking. Structurally, the overall capacity of the street will meet a 10-ton design. Project is included City of Lake Elmo Fiscal Year 2024-2033. As of January 17, 2025, project funded in FY2024, 2025, 2029. Construction is underway and a contractor is identified. Construction completion expected early June 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Under Construction

Roads / Highways

$4,368,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
264
Active Projects
128
Bidding Soon
1,592
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2024

Project location map

Hudson Blvd, Lake Elmo, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.