BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 25, 2023 at 8:00 PM

Updated January 26, 2024

Site work, paving and new construction of a mixed-use development in Alma, Georgia. Working plans call for the construction of a 10,000-square-foot transportation facility; for site work for a transportation facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Due to funding project was not awarded. Unsure if/when project will rebid at this time. Proposed project is to construct a new 100'x100' Corporate/Maintenance Hangar with attached 30'x100' Airport Office Building, Parking, and general site improvements. Prospective bidders should read the following instructions carefully before submitting their bids. For each item on the bid form there is a space provided for the price to be shown in numerals and words. All notations must be in ink. Totals read at the opening of bids are not guaranteed to be correct and no final award of contract will be made until the bid and extensions have been verified. A Bidder's bond must be executed on the form furnished by the Owner, and the required bond, cash, cashier's check, or certified check must accompany each proposal, in the amount of 5% of the total amount of the proposal. A 100% performance bond and a 100% payment bond will be required of the Contractor at time of contract execution. A Georgia Resident Agent must countersign all bonds from a surety company authorized by law to do business in this State pursuant to a current certificate of authority to transact surety business by the Commissioner of Insurance; no bond shall be approved unless the surety is on the United States Department of Treasury's list of approved bond sureties. The successful bidder will be required to provide the Owner with the affidavit required by OCGA 36-91-21 (e) Competitive Award Requirements. All work under the contract shall be completed within three-hundred sixty (360) calendar days from the issuance of the notice to proceed. Liquidated damages for delays in completion will be in $750 per calendar day. Payment will be made monthly on completed work. Retainage will be held by the Owner to a maximum of ten percent (10%) of each progress payment. THE RIGHT TO REJECT ANY OR ALL BIDS AND TO WAIVE INFORMALITIES IS RESERVED TO THE OWNER.

Final Planning

Transportation Terminals

$1,000,000.00

Public - County

New Construction, Paving, Site Work

44

9

7

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
43
Bidding Soon
635
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2023

August 8, 2023

Project location map

142 Airport Loop, Alma, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.