Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and asbestos abatement for a hospitality development in Chattanooga, Tennessee. Working plans call for the demolition of a hospitality development; for site work for a hospitality development; and for asbestos abatement for a hospitality development.
The scope of work shall consist of but not limited to the following: The purpose of the project is to abate the Mold that was caused from previous leaking plumbing in the motel, however to address the Mold issue, it is required to perform General Demolition of the gypsum walls and insulation along the length of the 1st floor for both sides of the plumbing chase walls, and the existing motel room interior wall along such chase walls and in the bathrooms to a height of 4' from the floor, to include removal of the existing plumbing fixtures, such as toilets, lavatories and associated casework, showers and combined tub and shower units, and to protect the existing drain pipe connections and water supply lines. On the 2nd floor specific rooms have been identified as part of the General Demolition and shall be demolished in the same manner (note that the 2nd floor is adjacent to the hallway and not a chase). Secondary Demolition will be required following inspection of the existing wooden structure members to determine the extent of additional gypsum, insulation, plumbing fixture, and other material removal. A 3rd phase of Demolition will be required to remove all of the room furnishings / furniture, to include mattresses, box springs, bed rails, carpet, draperies, chest and/or dressers, microwaves, etc. for all the guest rooms, office areas, laundry areas, assembly areas, and apartment area. Materials left in place in demolition areas must be cleaned to the limits and as directed by the Owner's environmental specialist. All demolished material shall be removed, placed into roll-off containers, hauled away and disposed of properly at the appropriate landfills. At its conclusion, the project must meet an Indoor Air Quality standard, as determined by testing. Contractor shall provide all labor, equipment, materials, tools, site security, etc. to complete the project scope and timeline. All bidders must be licensed and shall comply with all requirements of the State of Tennessee Contractor's Licensing Act. The City of Chattanooga is an Equal Opportunity Employer.
Final Planning
Hotel / Motel
$200,000.00
Public - City
Asbestos Abatement, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 11, 2023
July 10, 2023
7725 Lee Hwy, Chattanooga, TN
Related To This Project
Chattanooga, TN
Bid Date: Feb 02 2023
Chattanooga, TN
Bid Date: Jan 24 2023
Chattanooga, TN
Bid Date: Jan 24 2023
Chattanooga, TN
Bid Date: Feb 07 2020
Chattanooga, TN
Bid Date: Mar 07 2023
Chattanooga, TN
Bid Date: Jan 18 2023
Chattanooga, TN
--
Chattanooga, TN
Bid Date: Jan 31 2023
Chattanooga, TN
--
Chattanooga, TN
Bid Date: Jan 25 2023
Chattanooga, TN
Bid Date: Sep 21 2022
Chattanooga, TN
Bid Date: Nov 04 2022
Chattanooga, TN
Bid Date: Sep 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.