Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Sterling, Alaska. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Federal# / IRIS Program#: 0A33026 / CFHWY00130 - Sterling Safety Corridor Improvements MP 82.5 to 94 - The project proposes to improve the Sterling Highway between Sterling and Soldotna to improve safety, reduce congestion, and increase travel efficiency. The Preferred Alternative would construct a four-lane divided highway, with a depressed median from approximately Handley Street in Sterling to Kleeb Loop in Soldotna, with each end transitioning to a four-lane highway divided with a center two-way left-turn lane to tie back into the existing lane configurations. Additional improvements include median breaks with dedicated left-turn lanes, frontage road and pedestrian facility construction, utility relocations, vegetation clearing, drainage improvements, and roadside hardware upgrades. Region: Central Region A two-step selection process will be used to select a Design Builder for the project. In response to the RFQ, Prospective Proposers will submit their Statements of Qualification for review and scoring. A List of Prequalified Prospective Proposers will then be published and those named entities will be invited to participate in Step 2: the RFP and Proposal process. The selected Design-Builder will provide design and construction services to design and construct a four lane divided highway from approximately Sterling Highway MP 82.5 to 94. The proposed federally funded project will improve safety and reduce congestion. See Project Description and Scope of Work (Attachment A). On the Job Trainees/Apprentices (item 645): None Engineer's Estimate Range: Between $70,000,000 and $80,000,000 The Project Completion date will be September 30, 2025. Individuals with disabilities, including the hearing impaired, who may need auxiliary aids, services, and/or special modifications to submit a bid/proposal should contact the TTD number: (907) 269-0473, no later than one week prior to the submittal date to make any necessary arrangements. AKDOT - RFQ D/B - Sterling Safety Corridor Improvements MP 82.5 to 94 Design-Build *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Preferred Alternative would construct a four-lane divided highway with a depressed median from approximately Handley Street in Sterling to Kleeb Loop in Soldotna, with each end transitioning to a four-lane highway divided with a center two-way left-turn lane to tie back into the existing lane configurations. The proposed project corridor would be developed as a partial limited access facility with allowable access points defined by breaks in controlled access lines. Additional improvements include median breaks with dedicated left-turn lanes, frontage road and pedestrian facility construction, utility relocations, vegetation clearing, drainage improvements (including replacing the existing culvert at Soldotna Creek), installing continuous lighting, fish passage culvert replacement, and roadside hardware upgrades The Design-Builder will provide all design necessary to complete and construct the Sterling Safety Corridor MP 82.5-94 project including but not limited to; roadway geometrics and design, geotechnical considerations, any required retaining walls or structures (none currently anticipated), drainage, maintenance of traffic, signing, lighting, instrumentation, traffic markings, utility relocations, aesthetics and landscaping, environmental compliance, public information, right-of-way considerations, protection of airspace considerations, quality program, removal of structures and obstructions, and warranties. All construction will need to minimize impacts to the adjacent environmental areas as described in the EA and other project documents.
Post-Bid
Roads / Highways
$80,000,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 9, 2023
October 9, 2023
Sterling Hwy, Sterling, AK
Related To This Project
Sterling, AK
Bid Date: Jun 07 2023
Sterling, AK
Bid Date: Dec 07 2023
Sterling, AK
--
Sterling, AK
Bid Date: Mar 31 2020
Sterling, AK
Bid Date: Sep 16 2021
Delta Junction, AK
--
Sitka, AK
Bid Date: Dec 06 2022
Wasilla, AK
Bid Date: Dec 06 2022
Unalaska, AK
--
Unalaska, AK
--
Unalaska, AK
--
Unalaska, AK
--
Unalaska, AK
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.