BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 29, 2024 at 8:00 PM

Updated May 30, 2024

Site work and paving for a mixed-use development in Moncton, New Brunswick. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work consists of the construction of a new, single-lane roundabout that includes four (4) approaches: Worthington Avenue Extension (two (2) approaches), Ayer Avenue, and a Future Street. The Worthington Avenue Extension approaches will be a full street construction, including sidewalk on one (1) side, and a multi-use trail on the other side. For the Ayer Avenue extension from the intersection of Preston Crescent / Ayer Avenue to the new roundabout, it will be a full street construction, include sidewalk on both sides. The Future Street (north approach) will be a full street construction, including sidewalk on one (1) side. In addition to full street construction, the Work will also include the installation of new storm sewer, sanitary sewer and watermain on the various approaches, services to vacant lots, underground wiring, and pole bases for street lighting and landscaping. The full street construction of the east approach of Worthington Avenue Extension will be limited to approximately the first thirty-five meters (35m) from the roundabout; however, sanitary sewer and watermain will be extended beyond this limit and connect to the existing systems on Mountain Road. Work to extend the sanitary sewer and watermain to Mountain Road will involve trench restoration in roadways, parking lots, and landscaped areas. Trenches in these areas are to be restored to match existing conditions and grades. Work will also include modifications to the existing NBCC parking lot, including extensions to the existing parking area and line painting modifications, and construction of a new sixty-six (66) space parking lot including storm and drainage infrastructure and line painting. Contractors are advised that all work within the existing NBCC parking lots and construction of the NBCC parking lot expansion (including line painting) must be completed by AUGUST 30, 2024. The remainder of the work must be substantially completed no later than NOVEMBER 6, 2024. Documents are available at http://moncton.bidsandtenders.ca

Award

Roads / Highways

$5,379,309.00

Public - City

Paving, Site Work

19

9

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
23
Bidding Soon
331
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2024

July 8, 2024

Project location map

Worthington Ave, Moncton, NB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.