Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 8, 2026 at 8:00 PM

Updated October 14, 2026

Site work and paving for a civil project in Houston, Texas. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Pre-Bid Questions Deadline: September 18, 2026@ 4:00pm (CT) Requests for additional information and questions shall be addressed to the Finance Department, Strategic Procurement Division Ana Abud , Procurement Specialist, preferably by e-mail to ana.abud@houstontx.gov or by telephone at (832) 393-395-2830n WBE Goal: 4% SBE Goal: 12% Notification of Intent to Award (estimated) October 2026 Council Agenda Date (estimated) December 2026 Award Start Date (estimated) December 2026 The Contractor shall be required to provide and submit, along with the bid, a Bid Bond or a certified or cashier's check (each a ''Security Deposit'') in the amount of 10% of the total bid amount. The certified or cashier's check shall be made payable to the City of Houston. The project location is generally bounded by White Oak Bayou at the north, I-10 Frontage Road at the south , Durham Drive at the east and TC Jester Boulevard at the west, Key Map No. 492C, 492G The Cottage Grove East- Phase II Paving and Drainage Improvements includes removing existing pavement and utilities, building new pavement and utility systems, and installing lighting, signs, and pavement markings, along with traffic control and stormwater prevention measures in Cottage Grove East, including Cottage Grove, Cottage Oaks, and Brunner. Hispanic-owned Firms are capped at 16% MBE in Construction & 7% MBE in Professional Services, Asian -owned Firms are capped at 6% MBE in Professional Services, and Women-owned Firms are capped at 8% WBE in Goods ork of the contract is for the removal of existing pavement and the removal or abandonment of existing storm sewers and utilities and the construction of pavements, storm sewers, water lines, and sanitary sewer improvements, installation of street lighting, signs and pavement markings, and the implementation of construction phase traffic control and storm water pollution prevention measures in Cottage Grove East, which includes Cottage Grove, Cottage Oaks, and Brunner Subdivisions . Included in the project are the following streets: 1. Egbert Street from TC Jester to Moy Street - 508 linear feet 2. Moy Street from Kiam Street to Dead End - 651 linear feet 3. Kansas Street TC Jester to Dead End - 762 linear feet 4. Kiam Street from TC Jester to Reinerman Street - 1,336 linear feet 5. Petty Street from TC Jester to Reinerman Street - 1,393 linear feet 6. Darling Street from Reinerman Street to N Durham Drive - 888 linear feet 7. Larkin Street from TC Jester to N Durham Drive - 2,240 linear feet 8. Cornish Street from TC Jester to N Durham Drive - 2,224 linear feet 9. Detering Street from IH 10 Frontage Road to Dead End - 1,872 linear feet 10. Reinerman Street from IH 10 Frontage Road to Kiam Street - 1,186 linear feet 11. Roy Street from IH 10 Frontage Road to Darling Street - 648 linear feet 12. Roy Circle Street from Darling Street back to Darling Street - 1,768 linear feet 13. Sandman Street from IH 10 Frontage Road to Darling Street - 670 linear feet The proposed storm sewer system consists of 24-inch through 72-inch reinforced concrete pipe and reinforced concrete box. Proposed storm sewer appurtenances include manholes, inlets, catch basins, junction boxes and yard drains. Yard drains, shall be construction per detail , see sheet 196. Make connections to the existing yard drain piping within the street right-of-way, as close to the proposed street as possible. Details for large cast in place junction boxes are on sheets 125 thru 142 of the plans. The contractor may use precast junction boxes in lieu of cast-in-place construction. Contractor shall submit sealed and signed shop drawings for precast alternates to castin-place junction boxes. The proposed pavement construction shall be 6-inch or 7-inch reinforced concrete pavement with curbs on an 8-inch lime stabilized subgrade. Egbert Street and Larkin Street shall be 7-inch-thick reinforced concrete pavement all other streets shall be 6- inch reinforced concrete pavement. Other pavements in the project are concrete driveways, sidewalks, and mailbox pads within the City's right-of-way. Proposed driveways are noted in the drawings. The width of drives shall match the existing driveway width at the right of way. Contractor to coordinate driveway construction with property owners. The contractor shall install and remove temporary driveways. Payment for temporary driveways is for one temporary driveway per location for proposed driveways shown in the drawings. Contractor shall coordinate driveway access with property owners and business operators. Contractor shall maintain vehicle access to properties. The proposed Hike and Bike Trail at the intersection of Moy St. and Egbert St

GC Bidding

Roads / Highways

$25,000,000.00

Public - City

Paving, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
201
Bidding Soon
4,105
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed