Published April 26, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Linesville, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

\The scope of work includes providing, complete installation and placing in operation a Supervisory Control and Data Acquisition (SCADA) system and all necessary appurtenances and restoration for said construction. Work includes, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all work in accordance with the Contract Documents. Question Deadline 02/03/2023 The project is being financed by the Pennsylvania Infrastructure Investment Authority (PENNVEST). Bidder must agree to comply with all requirements associated with the funding. Federal Davis Bacon wage rates, Minority Business Enterprise / Women's Business Enterprise (MBE/WBE) requirements, and Build America, Buy America (BABA) Act requirements apply. This project is being federally funded by EPA financial assistance dollars and therefore requires all contractors to demonstrate compliance with federal Executive Orders 11625, 12138, and 12432 and EPA Regulations at 40 CFR Part 33, through the detailed documentation of solicitation of Disadvantage Business Enterprises (DBEs). Contractors must demonstrate the Six Good Faith Efforts to identify and solicit DBE firms that are potential sources for any procurement action in the areas of project construction, equipment, services, and supplies by including state qualified small businesses, and minority and women owned business enterprises in the bidding process. The Successful Bidder will be required to meet all Federal Requirements and Certifications in Executive Order Nos. 11246 and 11375. Proposals must be upon the forms furnished by the Borough. The bid must be accompanied by a certified check or bid bond in the amount of ten percent (10%) of the bid, made payable to Linesville Borough to guarantee the bidder's entrance into the contract if given the award. No bid bond shall be waived or returned because the Bidder has failed to or cannot comply with any requirements as set forth in the plans, specifications, or any applicable statutes of the State of Pennsylvania or any applicable municipal ordinances. Attention is directed to the fact that procurement is subject to all requirements of the Pennsylvania "Steel Products Procurement Act, Act No. 1978-3"; and for Contract value exceeding $25,000, the Federal Davis Bacon Wage Rates, and The Public Works Employment Verification Act (July 2012) apply. The Borough shall (a) award the construction contract to the lowest responsible bidder therefore, or (b) reject all bids received within ninety (90) days of the date of bid opening; provided, however, that Linesville Borough may, in its sole discretion, delay such award or rejection for up to one hundred twenty (120) days from the bid opening date until the Borough has received all required approvals from other governmental agencies. Bidders on this work will be required to comply with Title VI of the Civil Rights Act of 1964. The Borough reserves the right to reject any or all proposals and to waive any informalities in the bidding. No bid may be withdrawn for ninety (90) calendar days after the scheduled time for receipt of bids.

Post-Bid

Water / Sewer

$500,000.00

Public - City

Renovation

7

8

9

7

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Closeout Submittals, Warranties
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
95
Bidding Soon
997
All Active Projects
452
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2023

March 28, 2023

img_map_placeholder

Multiple Locations, Linesville, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water System Telemetry

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.