BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 14, 2024 at 8:00 PM

Updated August 15, 2024

Site work and paving for a bridge / tunnel in Columbia, North Carolina. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The new bridge will replace the existing swing-span bridge with a modern two-lane, fixed-span, high-rise bridge. It will also be built on a new location, just north of the existing bridge. As of August 14, 2024, the construction has started with test piling beginning in early August 2024. The construction is anticipated to be complete in 2028. STIP Number: HB-0001

Under Construction

Bridges / Tunnels

$271,200,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
45
Bidding Soon
599
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

Project location map

US-64, Columbia, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.