Published February 24, 2023 at 7:00 PM

Updated January 26, 2024

Site work, paving and renovation of a civil project in Willamina, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; for the renovation of a water / sewer project; and water / sewer project.

City of Willamina will open sealed bids from qualified contractors for the construction of the Willamina Water System Improvements Project B. No bids will be received after the BID CLOSING time. The Project generally consists of demolition of the existing intake; construction of a new water intake with fish screen and air burst cleaning system; a new access road with a soldier pile retaining wall; upgrades to the existing pumping facility including new 12-inch yard piping, coating, electrical, and mechanical improvements; grading; paving; temporary water management and fish removal; integration of an existing emergency generator into the system; site restoration and planting; construction of stormwater improvements including replacement of an existing culvert beneath a private rail siding (rail work will be by a specified contractor); and all Labor, Materials, and incidentals necessary to complete the Work as shown. This project is funded whole or in part by local funds and the following funding Agency Partners ("Agency"): . Federal Safe Drinking Water Revolving Loan Fund (SDWRLF) . Federal Community Development Block Grant (CDBG) . Federal Community Development Block Grant CARES Act Funding, Impact Assistance Public Facilities Grant (CDBG-CV) . Yamhill County ARPA Grant . U.S. Environmental Protection Agency (EPA) Community Grant Bidders shall comply with Agency requirements, including American Iron and Steel (AIS) and Buy American Sourcing requirements (i.e., BABA), as included in these specifications and submit the required forms. Questions regarding the project should be referred to Jeff Brown, Public Works Director (brownj@ci.willamina.or.us), Luke Tabor, EI, Project Engineer, Keller Associates, (ltabor@kellerassociates.com), and Shannon Williams, PE, swilliams@kellerassociates.com. Bidding Documents may also be obtained from the Issuing Office during the hours indicated above. Bidding Documents are available on compact disc (as portable document format (PDF) files) for a non-refundable charge of $125.00. Alternatively, printed Bidding Documents may be obtained from the Issuing Office either via in-person pick-up or via mail, upon Issuing Office's receipt of payment for the Bidding Documents. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. This is a public work contract subject to ORS 279C. 800 to 279C.870 and the federal prevailing rate of wage required under the Davis-Bacon Act (40 U.S.C. 276a) and related acts, and any amendments in effect at time of solicitation. Both State and Federal prevailing wage laws apply. Oregon law requires that the higher of the State prevailing wage rates or Federal Davis-Bacon Act prevailing wage rates be paid to workers on projects subject to both the State prevailing wage rate law and Federal Davis-Bacon Act. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. Bid security shall be furnished in accordance with the Instructions to Bidders. The successful bidder will be required to furnish to the Owner a performance bond and a payment bond each equal to one hundred percent (100%) of the amount of the bid. The successful bidder and all subcontractors will be required to furnish to the Oregon Construction Contractors Board a public works bond in the amount of five percent (5%) of Bidder's maximum Bid price (determined by adding the base bid, Schedule A and all alternates), unless exempt under ORS 279C. The Owner reserves the right to reject any and all bids, to waive any irregularities, and to accept the bid deemed in the best interests of Owner. Owner may reject any bid not in compliance with all prescribed public bidding procedures and requirements and may reject for good cause any or all bids upon a finding of the agency, if it is in the public interest to do so. The Contractor shall note that this is a public works contract subject to subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u (Section 3). As such, preference shall be given to qualified Section 3 Business Concerns when awarding the Contract. Additionally, this calls for affirmative action by the Contractor to train and/or hire Section 3 Workers and to Subcontract with Section 3 Business Concerns. Any business seeking Section 3 preference in the awarding of contracts or purchase agreements with the City should follow the steps The term "iron and steel products" means the following products made primarily of iron and steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. This project is financed with federal monies that may be subject to statutory requirements commonly known as "Build America, Buy America" provisions of the Infrastructure Investment and Jobs Act (IIJA) (P.L. 117-58, 70911-70917).

Award

Roads / Highways

$4,644,754.00

Public - City

Paving, Renovation, Site Work

188

76

153

11

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Unit Prices, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Temporary Construction, Temporary Bridges, Temporary Controls, Temporary Erosion and Sediment Control, Temporary Storm Water Pollution Control, Project Identification, Temporary Project Signage, Execution and Closeout Requirements, Examination and Preparation, Construction Surveying, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Metal Floor Plates
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Collection and Disposal Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Shoring and Underpinning, Special Foundations and Load-Bearing Elements, Driven Piles, Steel Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Concrete Curbs and Gutters, Site Improvements, Fences and Gates, Chain Link Fences and Gates, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Common Work Results for Process Valves, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Dies
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
34
Bidding Soon
658
All Active Projects
247
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2023

March 13, 2023

img_map_placeholder

Multiple Locations, Willamina, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.