BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a fire / police facility in Au Sable Forks, New York. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

For New Fire Station - Contract No. 4 Electrical Work - New Fire Station - Construction of a new single-story fire department building 2456 Route 9N Au Sable Forks, New York 12912 The RFI deadline is Friday, January 27th at 5:00pm. All Addendums will be issued by Friday, February 3rd. All Inquiries: Annette Schilling - Hueber-Breuer Construction Co., Inc. 315.476.7917 | phone aschilling@hb1872.build *All inquiries shall be via e-mail The project consists of site work and construction of a new single-story fire station with a mezzanine level within the apparatus bay. Award Construction Contract (20) days after bid opening. Start Construction May 1st, 2023. Construction Substantially Complete/Owner Occupy (36) weeks after start of construction. Construction Close-Out (38) weeks after start of construction. Any bidder requiring documents to be printed shall make arrangements with the printer directly and pay for all associated costs including printing, packaging and shipping. Bid Security in the amount of (5%) of the bid must accompany the bid in accordance with the Instruction to Bidding Bidders will be responsible for paying prevailing wages throughout the course of this project. The Au Sable Forks Fire District is an Equal Opportunity Employer; it does not illegally discriminate on the basis of race, religion, gender, age, color, disability, national origin, or ethnic heritage or any other protected classification and encourages participation by minority and women-owned businesses. The Board of Fire Commissioners, Construction Manager or the Architect/Engineer will not be responsible, in any manner, for verbal answers to any inquiries regarding the Specifications, the Notice to Bidders or any other matter connected with the awarding of the contract for said fire station. Each Bidder must comply with the laws of the State of New York, insofar, as they apply to the fire station construction. All bids shall be less State, Federal, or local taxes that are not applicable to municipal purchases. No bidder may withdraw his bid within (45 days) forty-five days after the date set for the opening thereof. A Certificate of Authority to do business in the State of New York, under Section 1301 of the Business Corporations Law of the State of New York shall be submitted by any out-of-state corporations or companies with their bids The Owner further reserves the right to reject any and all bids, by Order of the Board of Fire Commissioners of the Au Sable Forks Fire District. Bidding Documents may be examined at the following locations: Hueber-Breuer Construction Co., Inc. 148 Berwyn Avenue Syracuse, New York 13205-0515 315.476.7917 | phone Eastern Contractors Association, Inc. 6 Airline Drive Albany, New York 12205 518.869.0961 | phone 1. Coordination with the work of all of the other Contractors 2. All cutting and patching necessary for work of this contract, including layout, sleeves, coring,debris removal, saw cuts, providing lintels, drywall work, grouting, painting, ceiling removal and replacement, etc. 3. Provide and maintain Temporary Electrical Service and Temporary Lighting as called for in this Project Manuel (temporary usage charges are to be paid by Owner). Provide temporary power for trailers on site as directed. Remove all temporary power and lighting when no longer required. 4. Provide all conduits and wiring for site lighting, power, controls, telephone, data, cameras, security systems, spare conduits, etc. shown on site drawings or indicated on electrical drawings. 5. Site wiring and conduits shown entering the building are to be brought into the building by the EC. 6. Furnish and coordinate with the GC all roof curbs, collars and other roof penetration devices called for in EC's Work. Provide a physical mark on the roof deck with paint for each location. Such material is to be placed on the roof by the EC at the direction of the GC and in accordance with the GC's schedule. GC will cut decking. 7. Finish, physically locate and mark any sleeves for its work to the GC for installation. 8. All disconnects are by EC 9. Install equipment motor starters furnished by MC or PC. All panel wiring from panel board to starter to motor is by EC. 10. Provide any exterior site lighting concrete bases. 11. Provide connection to all kitchen equipment. 12. Provide Firestopping and sealing all electrical penetrations. 13. All necessary connections, infrastructure or tie-ins necessary for Owner supplied FF& 1. Alternate No. 1 - Future Administrative Area Fit-Out a. Base Bid: Interior fit-out in these rooms (00, 00A, 02, 03, 04, 05, 06, 07, 08, 10 & 12 - exterior walls only, no interior walls) & shall include exterior metal studs, insulation, concrete floor slab, temporary lighting, temporary heating, in-slab plumbing, and other items noted on the base-bid scope drawings provided by all prime contracts. Base bid scope shall include exterior wall shell construction. b. Alternate: Provide all work required to complete the fit-out of these rooms (00, 00A, 02, 03, 04, 05, 06, 07, 08, 10 & 12) including gyp. bd., painting, flooring, base, window trim, doors, door frames, hardware, ceiling tiles, lighting, all power and data, all mechanicals, all plumbing, and other items noted on the alternate scope drawings provided by all prime contractors. 2. Alternate No. 2 - Future Classroom/Training Room, Kitchen and Day Room FitOut a. Base Bid: Interior fit-out in these rooms (01, 09 & 11 - exterior walls only, no interior walls) shall include exterior metal studs, insulation, concrete floor slab, temporary lighting, temporary heating, in-slab plumbing, and other items noted on the base-bid scope drawings provided by all prime contracts. Base bid scope shall include exterior wall shell construction. b. Alternate: Provide all work required to complete the fit-out of these rooms (01, 09& 11) including gyp. bd., painting, flooring, base, window trim, doors, doorframes, hardware, ceiling tiles, lighting, all power and data, all mechanicals, all plumbing, and other items noted on the alternate scope drawings provided by all prime contractors.

Post-Bid

Fire / Police

$475,000.00

Public - County

New Construction, Site Work

130

56

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
268
Active Projects
138
Bidding Soon
2,007
All Active Projects
859
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 9, 2023

May 1, 2023

January 22, 2024

img_map_placeholder

2456 State Hwy 9N, Au Sable Forks, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.