EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 19, 2023 at 8:00 PM

Updated October 1, 2024

Demolition, site work, renovation and addition to a pre-engineered storage facility in Pittston Twp, Pennsylvania. Completed plans call for the renovation of a 15,000-square-foot pre-engineered storage facility; for the addition of a pre-engineered storage facility; for the demolition of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The Commission on Economic Opportunity (CEO) will receive Bids for the REBIDDING of the Additions and Modifications to the Monsignor Andrew J. McGowan Center for Healthy Living Weinberg Northeast Regional Food Bank, Jenkins Township, PA. The work, a Redevelopment Assistance Capital Program (RACP) project is generally comprised of a 15,000 SF pre-engineered steel warehouse expansion, related site, HVAC, plumbing, fire protection, electrical and all incidental work related thereto. They will be considered at a meeting of the CEO to be scheduled. Construction Work is included in one (1) Prime Contract. Bids shall be on a lump sum basis with alternate bids as indicated in the Bid Form. Each Bid, when submitted, must be accompanied by a (A) "Bid Security" in an amount equal to 10% of Bidder's maximum Bid price to be furnished in accordance with the Instructions to Bidders; and (B) all forms, statements, affidavits, and certifications, as more particularly listed in the Bid Form A Pre-Bid Conference has not been scheduled.Changes will be coordinated through Addenda that will be issued to bidders. The Labor Standards, Wage Determination Decision and Anti-Kickback regulations (29 CFR, Part 3) issued by the Secretary of Labor are included in the contract documents of this project and govern all work under the contracts. The contractor must comply with the minimum rates for wages as determined by the US Department of Labor in the Federal Register in accordance with the Davis-Bacon Act AND as determined by the Pennsylvania Department of Labor and Industry in accordance with the provisions of the Pennsylvania Prevailing Wage Act (43 P.S. 165-1 through 165-17) Non-discrimination in Employment--Bidders on their work will be required to comply with the President's Executive Order 11246 and will be required to insure that employees and applicants for employment are not discriminated against on the basis of their race, color, national origin, sex, religion, age, disability, familial status in employment or the provision of services. The successful bidder must utilize to the greatest extent feasible, minority and/or women-owned businesses located in the municipality, county, or general trade area. The CEO does not discriminate on the basis of race, color, national origin, sex, religion, age, disability of familial status in employment of the provision of service. The CEO is an Equal Opportunity/Affirmative Action Employer. The successful Bidders will be required to furnish and pay for a satisfactory Performance Bond, and a Labor and Material Payment Bond, each in an amount at least equal to the Contract Price. The CEO reserves the right to reject any or all Bids and to waive informalities in the Bidding. Bids may be held by Owner for a period of not to exceed sixty (60) days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of a Contract.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$570,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Construction, Temporary Ramps, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Roofing and Siding Panels, Metal Roof Panels, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Ceilings, Acoustical Ceilings, Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Foodservice Equipment
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures, Metal Building Systems
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers
Division 27 - Communications

Division 27 - Communications

Communications, Structured Cabling
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
110
Bidding Soon
1,445
All Active Projects
651
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2023

May 17, 2023

img_map_placeholder

185 Research Drive, Pittston Twp, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Rebidding of Additions and Modifications to the Monsignor Andrew J. McGowan Center

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.