BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Ankeny, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Description: The 2023 PCC Reconstruction Program - SE 8th Street project includes pavement reconstruction and minor utility improvements along SE 8th Street from just west of SE Rio Circle/SE Richland Court to just west of SE Michael Drive in the City of Ankeny. The construction improvements include the slip-form paving of approximately 3,000 SY of 8" thick PCC Class C-SUD street pavement, along with approximately 225 SY of 7" thick PCC Class C-SUD intersection handwork, and 175 SY of 6" thick PCC Class C residential driveways. Other associated improvements include Class 10 excavation, subgrade preparation, modified subbase placement, subdrain installation, removal and replacement of storm sewer structures, minor and major adjustments to existing storm sewer and sanitary sewer structures, surface restoration, temporary traffic control, mobilization, and miscellaneous associated work necessary to complete the project. Additional Description: The Contractor shall substantially complete the overall project in forty (40) working days. Substantial completion for the overall project shall be defined as all utility, grading, and pavement construction completed, with the new signs installed, and the new streets, driveways, and sidewalks fully open to traffic. Should the Contractor fail to substantially complete the work in this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete the overall project in ten (10) working days following substantial completion of the overall project. Full completion for the overall project shall be defined as all work including temporary surface restoration and punch list items completed, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s).

Bid Results

Roads / Highways

$642,101.00

Public - City

Paving, Site Work

38

9

2

9

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
45
Bidding Soon
469
All Active Projects
256
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2023

June 5, 2023

img_map_placeholder

SE 8th St, Ankeny, IA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.