BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a swimming pool in Greenwood Village, Colorado. Completed plans call for the construction of a swimming pool; and for site work for a swimming pool.

As of 2/10/23 ADDA 1. 2 and 3 are available. Contact owner for more information. The Aurora Highlands is a master planned community located on the high plains prairie, approximately three miles south of Denver International Airport (DIA). The site is located east of Picadilly Road, south of 56th Avenue, north of 26th Avenue, and west of Powhaton Road (future alignment) with a portion also east of Powhaton south of 48th Avenue (future alignment). The development consists of approximately +/- 3,884.9 total acres which is anticipated to be developed with single family and multi-family homes, commercial, retail, industrial, and other amenities, reaching an estimated population of approximately 41,823 people at full build-out. AACMD is responsible for designing, constructing, and managing the construction of certain public improvements benefiting The Aurora Highlands, both onsite and offsite. The Design-Builder shall design and construct an indoor-outdoor aquatic center, and shall maintain the aquatic center for a period of one year following substantial completion of the entire work. The Design-Builder will not be responsible for the grading or excavation of the project site, but shall instead assume that the lot will be graded and finished. Owner's objective is to begin operating the aquatic center no later than summer 2024. The Owner's budget for the aquatic center is currently approximately eight million dollars ($8,000,000.00), including design and construction, but excluding maintenance. As of the date of this RFQ/P, the Owner anticipates that the aquatic center and associated parking lot will include (but is not limited to): (1) a 20' x 30' Porte-Cochere, (2) 2400 square feet for the lobby, hallways, and locker rooms, (3) 1400 square feet for IT rooms, offices, electrical and mechanical rooms, a break room, and storage, (4) a 28' x 25' glass atrium with sliding doors, landscaping and lounge areas, (5) a 140' x 70' by 33' height natatorium containing a 25 meter lap pool, separate slide pool, separate splash pool, and a Jacuzzi, and (6) exterior pools consisting of a free-form, resort-style pool with two Jacuzzis, heated concrete, pool deck, shade structures and fencing. More detail regarding the aquatic center envisioned by AACMD, including an example of the glass structure to be used, is set forth in the Programmatic Drawings, provided as an attachment. The Aurora Highlands Development Plan is also provided as an attachment. The Immediate Stakeholders in This Project Include: The Aurora Highlands Community Authority Board The Aerotropolis Area Coordinating Metropolitan District ("aacmd"), the Aurora Highlands Metropolitan District No. 1 ("district No. 1"), the Aurora Highlands Metropolitan District No. 2 ("district No. 2"), the Aurora Highlands Metropolitan District No. 3 ("district No. 3"); and Aurora Highlands, Llc Required Acknowledgement ATTACHMENT ACKNOWLEDGEMENT We have reviewed all documents including addenda related to this solicitation. Bid Intent Optional Bid Intent Deadline 02/03/2023 07:00 PM EST Question Acceptance Deadline 02/02/2023 07:00 PM EST Questions are submitted online Yes

Post-Bid

Swimming Pools

$8,000,000.00

Public - County

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
110
Bidding Soon
1,651
All Active Projects
691
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 10, 2023

April 10, 2023

img_map_placeholder

To Be Determined, Greenwood Village, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.