BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Monrovia, California. Completed plans call for site work for a water / sewer project.

All Bids must be made on the form furnished by the City. Each Bid must be submitted in a sealed envelope addressed to the City Clerk with the Project name and identification number typed or clearly printed on the lower left corner of the envelope. Bids must remain valid and shall not be subject to withdrawal for sixty (60) Days after the Bid opening date INCORPORATION OF STANDARD SPECIFICATIONS - The 2021 edition of "Standard Specifications for Public Works Construction" ("Standard Specifications"), as amended by the Contract Documents, is incorporated into the Contract Documents by reference SCOPE OF WORK - The Project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer The Project Includes: Construction of: Remove and move well housing, move well housing back into place after work is performed, Replace starter with new soft starter with bypass switch, remove existing electric motor and provide and install new electric driver motor, remove existing column, shaft and bowl assembly from well, video log well casing before and after cleaning, bail oil from well, perform CITM, casing inspection thickness measurement, brush well casing, airlift and/or bail debris generated from cleaning, provide and install new 12" column pipe, provide and install new stainless steel well pump shaft, provide and install new stainless steel enclosing tube, provide and install new pump and bowl assembly, provide and install water flush inlet piping system, reseal well hole, install two sections of 2 1/2 " PVC flush thread tubing, perform and log spinner test, disinfect and flush well, and perform pump test, Submittals and Shop Drawings, Start up and closeout documentation including; start up, support, O&M Manuals, Mobilization, Demobilization, Bond, and Insurance. TRENCHES AND OPEN EXCAVATIONS. Pursuant to Labor Code Section 6707, if this Project involves construction of a pipeline, sewer, sewage disposal system, boring and jacking pits, or similar trenches or open excavations, which are five feet or deeper, each bid submitted in response hereto shall contain, as a bid item, adequate sheeting, shoring, and bracing, or equivalent method, for the protection of life or limb, which shall conform to applicable safety orders. REGISTRATION WITH THE DEPARTMENT OF INDUSTRIAL RELATIONS - In accordance with Labor Code Sections 1725.5 and 1771.1, no contractor or subcontractor shall be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5 [with limited exceptions for bid purposes only under Labor Code Section 1771.1(a)]. PREVAILING WAGES - In accordance with Labor Code Section 1770 et seq., the Project is a "public work". The selected Bidder (Contractor) and any Subcontractors shall pay wages in accordance with the determination of the Director of the Department of Industrial Relations ("DIR") regarding the prevailing rate of per diem wages. Copies of those rates are on file with the Director of Public Works and are available to any interested party upon request. The Contractor shall post a copy of the DIR's determination of the prevailing rate of per diem wages at each job site. This Project is subject to compliance monitoring and enforcement by the DIR. BONDS - Each Bid must be accompanied by a cash deposit, cashier's check, certified check, or Bidder's Bond issued by a Surety insurer, made payable to the City and in an amount not less than ten percent (10%) of the total Bid submitted. Personal or company checks are not acceptable. Upon Contract award, the Contractor shall provide faithful performance and payment Bonds, each in a sum equal to the Contract Price. All Bonds must be issued by a California admitted Surety insurer using the forms set forth in the Contract Documents, or in any other form approved by the City Attorney. Failure to enter into the Contract with the City, including the submission of all required Bonds and insurance coverage, within fifteen (15) Days after the date of the mailing of written notice of contract award to the Bidder, shall subject the Bid security to forfeiture to the extent provided by law. LICENSES - Each Bidder shall possess a valid Class "A" (General Engineering) or Class "C-57" (Water Well) Contractor's license issued by the California State Contractors License Board at the time of the Bid submission. The successful Contractor will be required to obtain a current City business license. RETENTION SUBSTITUTION - Five percent (5%) of any progress payment will be withheld as retention. In accordance with Public Contract Code Section 22300, and at the request and expense of the Contractor, securities equivalent to the amount withheld may be deposited with the City or with a State or federally chartered bank as escrow agent, which shall then pay such moneys to the Contractor. Upon satisfactory completion of the Project, the securities shall be returned to the Contractor. Alternatively, the Contractor may request that the City make payments of earned retentions directly to an escrow agent at the Contractor's expense. No such substitutions shall be accepted until all related documents are approved by the City Attorney. LIQUIDATED DAMAGES - Liquidated damages shall accrue in the amount of $2,500.00 for each Day that Work remains incomplete beyond the Project completion deadline specified in the Contract Documents. BIDDING PROCESS - The City reserves the right to reject any Bid or all Bids, and to waive any irregularities or informalities in any Bid or in the bidding, as deemed to be in its best interest.

Award

Water / Sewer

$316,160.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
108
Bidding Soon
2,229
All Active Projects
998
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2023

February 24, 2023

img_map_placeholder

To Be Determined, Monrovia, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.