BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2023 at 8:00 PM

Updated May 6, 2025

Site work, paving and new construction of a road / highway in Monrovia, California. Completed plans call for the construction of a road / highway; for site work for a road / highway; and for paving for a road / highway.

A Grade Separation Located on Montebello Boulevard in the City of Montebello Within the Union Pacific Railroad (Uprr) Los Angeles Subdivision at Milepost 8.30 to Milepost 8.92. The Grade Separation is Between Mines Avenue to the South and Whittier Boulevard to the North. Montebello Boulevard Will Be Lowered Beneath the Uprr Railroad. The Project Work Includes the Construction of Typical Street Features Such as Curb, Gutter, Sidewalk, Roadway Structural Sections, Landscape and Irrigation, and Site and Private Property Improvements; the Demolition of Buildings; Bridge Construction Including Demolition and Excavation for Underpass Bridge Substructure Elements, Construction of Cidh Piles, Abutments, Abutment Caps, Columns, Column Bent, Steel Girder Bridge With Concrete Fascia, and Earth Retaining Structures; Construction of a Pump Station and Storm Drain Improvements, Modifications, and Relocations; Grading and Preparing the Site Within the Uprr Right-of-way and Constructing Shoofly Tracks, Drainage Facilities, Sewer Crossing, Relocation of Utilities; Installation of a New Traffic Signals, Installation of Street, Bridge, and Parking Lot Lighting, Signing and Striping, Water Main, and Protection, Modification, and/or Relocation of Existing Dry and Wet Utilities. Temporary Work Consists of Shoring, Excavation Support Systems, and Traffic Control. Online Q&A Yes Q&A Deadline 05/04/2023 5:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Bid open - Meeting ID: 277 062 125 361 Passcode: iB8dVk Download Teams | Join on the web Learn More The project is estimated from $ 103,000,000 to $ 108,000,000. Project Scope Items: The project work includes, but is not limited to, the construction of typical street features such as curb, gutter, sidewalk, roadway structural sections, landscape and irrigation, and site and private property improvements; the demolition of buildings; bridge construction including demolition and excavation for underpass bridge substructure elements, construction of CIDH piles, abutments, abutment caps, columns, column bent, steel girder bridge with concrete fascia, and earth retaining structures; construction of a pump station and storm drain improvements, modifications, and relocations; grading and preparing the site within the UPRR rightof-way and constructing shoofly tracks, drainage facilities, sewer crossing, relocation of utilities; installation of a new traffic signals, installation of street, bridge, and parking lot lighting, signing and striping, water main, and protection, modification, and/or relocation of existing dry and wet utilities. Temporary work consists of shoring, excavation support systems, and traffic control. Said request shall be received by the AGENCY no later than 5:00 PM PST on MAY 4, 2023 via the AGENCY's online bidding system.

Bid Results

Roads / Highways

$127,136,977.00

Public - County

New Construction, Paving, Site Work

703

50

63

6

Subscribe For Documents

137 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
526
Active Projects
252
Bidding Soon
3,716
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2023

October 2, 2023

Project location map

Multiple Locations, Monrovia, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.