BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Tomah, Wisconsin. Completed plans call for the renovation of a one-story above grade medical facility.

FIRST SET OF RFI RESPONSES Ref specification 11 73 00- Can the weight capacity for the bariatric lifts be reduced from 1100lbs to 1000lbsAnswer: No See Attachment 1 with red arrows on plan to fully understand this RFI. Do the marks on the plans indicate type F8 lighting Answer: No, Type F7 sconce. Please provide information on an F15 light. Answer: Provide typ. Strip light. (Metalux 4SNX-41SL-FDL OR EQ.) Do the F11, F3 & lights in the bulb need separate switching from the room switching Answer: F3 in Bedroom = no. F11 in Team/Med room = yes. Does the project require Cat 6 or Cat 6A cable Both are mentioned on the drawings and spec. Answer: CAT 6A cable is required for all data cables. CAT 6 is required for duress buttons. Are the new data cables going to be terminated in the new (EHRM Project) or existing IT room Answer: The cables will be terminated at the patch panel in the new (designed) IT closet. EHRM project will complete the interior of the IT closet. The interior contents of the new IT closet are not in the Scope of this renovation. Do you want two 24 strand MM fibers installed or a SM and MM fiber Answer: SM Fiber Do you require a Cat 6 cable to each Duress button as the plans state Answer: CAT 6 is required for the duress buttons. Is a representative from the Div. 27 contactor required to provide training on VA provided equipment Answer: No. VA will train on all VA provided/contractor installed equipment. Are 20 mil studs acceptable Answer: The proposed ClarkDietrich 70 ksi G40EQ studs are acceptable. On Sheet AS601, the wall types for smoke and fire rated partitions indicate 3" mineral fiber (mineral wool type) for acoustical insulation. For thermal insulation the notes indicate batt insulation, and the acoustical walls that are not smoke or fire rated indicate batt insulation. Is the insulation noted as batt insulation not mineral fiber (mineral wool) Also, is glass fiber (fiberglass insulation) acceptable at the areas noted as batt insulation Is the thermal and acoustical insulation at the VA was typically mineral fiber (mineral wool type) There is a significant difference between mineral wool and fiberglass insulation. Answer: Specification 07 21 13 for insulation allows only Mineral Fiber for semi-rigid, batt, and blanket insulation. The specification calls out Aluminum ceiling grid for ACT. Aluminum is more expensive than steel. Generally, aluminum is only needed in high moisture areas to prevent rusting. Is aluminum to be used in all spaces Answer: Provide and install aluminum grids at the kitchen areas. Provide and install steel grid elsewhere. Are we to go by the spec supplied or the most current VA spec for Div. 27 Answer: The specification in the solicitation is sufficient as the revisions in most current version do not effect this project. Please use the specification in the solicitation. EXTRA NOTES FROM THE VA Corrections SheetA A A A A A A A A A A A A A A A A A A Note PD 101A A A A A A A A A A A A A A A A A Call out note at mixing valve is a 1, it should be 2. MD 102A A A A A A A A A A A A A A A A Call out note 9 should be a 7. IT closet will be completed by the EHRM project and will include all interior components.A This renovation project will be limited to pulling cable and terminating cable from end point to the IT closet patch panel. All components salvaged from this renovation project will remain in scope related to the IT closet. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Medical

$8,000,000.00

Public - Federal

Renovation

122

26

38

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
17
Bidding Soon
407
All Active Projects
158
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.