BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Collierville, Tennessee. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

For Wolf River Pedestrian Bridge The intent of the Request for Statement of Qualifications (RFSOQ) is to obtain proposals from and the services of qualified engineering firms to produce detailed designs, construction drawings, specifications, construction cost estimates, construction engineering inspection and to navigate the necessary environmental permitting process for design and construction of a pedestrian bridge over Wolf River. The general location for the bridge is at the end of the existing boardwalk in W.C. Johnson Park, Collierville, Tennessee. Letter Of Intent To Propose Deadline: January 25, 2023 Deadline for Written Questions: 5:00:00 P.M. Wednesday, January 25, 2023 In May of 2022, the Town of Collierville received State of Tennessee funding through a Governor's Award in the amount of $3 million for design and construction of a pedestrian bridge spanning the Wolf River, providing the Town's existing greenbelt system direct connection to 3.5 miles of primitive trails on the north side of the river. The Town desires a signature/iconic landmark bridge. The main bridge clear span across the Wolf River is expected to be roughly 270' long. The project will also include an undetermined length of at-grade and/or elevated ramp approach trail and trail realignment on both sides of the main span. ADA compliance is essential. The Town desires a cable supported truss which provides a 12' clear walkway width. The cable-stayed structure shall be visually appealing and shall fit well within the natural environment of the Wolf River. The bridge structure and its foundations are to be designed from steel and concrete and shall include low-maintenance materials including but not limited to weathering steel, fiber reinforced deck grating, galvanized/stainless steel hardware, precast concrete, and high-performance cast-in-place concrete. Use of wood materials as a primary design component is discouraged. Designs shall not utilize any permanent supporting structure within the main river channel. The successful Firm shall demonstrate to the Town that their design is constructible given the limited access to the site(s) and account for environmental and hydraulic limitations. Additionally, the selected Firm must demonstrate past experience in the design and construction of cable-stayed pedestrian bridges and their foundations under similar site conditions and for similar projects. The selected Firm will integrate aesthetic features into the design that fit within the project's budget. Items anticipated in the scope of this project include, but are not necessarily limited to, the following: project planning/scoping, consensus building for aesthetics, public engagement, survey, geotechnical, hydraulics & hydrology, environmental compliance, and detailed design. The method of contractor selection has not been determined at this time

Conceptual

Bridges / Tunnels

$2,733,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
97
Bidding Soon
834
All Active Projects
375
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 2, 2024

img_map_placeholder

To Be Determined, Collierville, TN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.