Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Pikeville, Kentucky. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The Department will perform visual inspections on all pipe on the project. A video inspection will be required on projects having more than 250 linear feet of storm sewer and/or culvert pipe and on routes with an ADT of greater than 1,000 vehicles. Conduct video inspections on all pipe located under the roadway and 50 percent of the remaining pipe not under the roadway. Storm sewer runs and outfall pipes not under the roadway take precedence over rural entrance pipes. Contractors performing this item of work must be prequalified with the Department in the work type J51 (Video Pipe Inspection and Cleaning). Deflection testing shall be completed using a mandrel in accordance with the procedure outlined below or by physical measurement for pipes greater than 36inches in diameter. Mandrel testing for deflection must be completed prior to the video inspection testing. Unless otherwise noted, Section references herein are to the Department's most current version of the Standard Specifications for Road and Bridge Construction. Pike County 12-9014 - KY 80 Safety Improvements. Install barcode label on sheeting signs. Section references herein are to the Department's Standard Specifications for Road and Bridge Construction, current edition. Except as specified herein, perform all work in accordance with the Department's Standard Specifications, Supplemental Specifications, applicable Special Notes and Special Provisions, and applicable Standard and Sepia Drawings, current editions. Furnish all materials, labor, equipment, and incidentals for the following work: Superelevation Improvements. Multiple curves, within the project limits, will receive superelevation improvements. Work will include edge key, longitudinal edge key, and placing asphalt leveling and wedging, placement of an asphalt surface course, installation of edge line rumble strips, and application of pavement markings. The intent of this work is to create a consistent cross slope through the curves identified in this proposal. The Engineer will make the final determination as to the appropriate lift thicknesses and the number of lifts required to achieve the desired cross slope based on the existing conditions encountered at the time of construction. As a result of this work, the shoulders, fill slopes, and/or ditches may need modifications to match the final pavement elevations and tie to the existing ground. The bid item 'Roadside Regrading' has been included for these roadside modifications. The Contractor is required to complete this work item prior to KY 80 being resurfaced. Perform all erosion and water pollution control work in accordance with any other notesin the Proposal, the Department's Standard and Interim Supplemental Specifications, the Special Provisions and Special Notes, and the Standard and Sepia Drawings, current editions, or as directed by the Engineer. Section references are to the Standard Specifications. This work shall consist of: (1) Developing and preparing a Best Management Practices Plan (BMP) tailored to suit the specific construction phasing for each site within the project; (2) Preparing the project site for construction, including locating, furnishing, installing, and maintaining temporary and/or permanent erosion and water pollution control measures as required by the BMP prior to beginning any earth disturbing activity on the projectsite; (3) Clearing and grubbing and removal of all obstructions as required for construction; (4) Removing all erosion control devices when no longer needed; (5) Restoring all disturbed areas as nearly as possible to their original condition; (6) Preparing seedbeds and permanently seeding all disturbed areas; (7) Providing a Kentucky Erosion Prevention and Sediment Control Program (KEPSC) qualified inspector; and (8) Performing any other work to prevent erosion and/or water pollution as specified by this contract, required by the BMP, or as directed by the Engineer. Except as provided herein, perform all work in accordance with the Department's Standard Specifications, interim Supplemental Specifications, Standard and Sepia Drawings, and Special Notes and Special Provisions, current editions. Article references are to the Standard Specifications. This project shall consist of furnishing all labor, equipment, materials, and incidentals for the following: (1) Site Preparation; (2) Maintaining and controlling traffic; (3) Temporary erosion control and temporary pollution control; (4) Cutting, trimming, and/or removing trees, stumps, and/or brush as specified or directed by the Project Engineer; (5) Treating all cutstumps required by Project Engineer to prevent re-sprouting; (5) Clean up and disposal of waste; (6) Final dressing and seeding and protection; and (7) all other work specified in the Contract. Except as provided herein, perform all work in accordance with the Department's Standard Specifications, interim Supplemental Specifications, Standard and Sepia Drawings, and Special Notes and Special Provisions, current editions. Section references are to the Standard Specifications. This project shall consist of furnishing all labor, equipment, materials, and incidentals for the following: (1) Contractor staking; (2) Site preparation; (3) Removing existing concrete masonry, as necessary; (4) Foundation preparation and construction of reinforced concrete box culvert extensions and headwalls; (4) Maintain and Control Traffic; and (5) all other work specified as part of this contract. Pike County Fd04 098 0080 000-002 : Ky Highway 80 (Ky 80) (Mp 0.000) From Us 460 to 0.561 Miles East of Ky 1373 (Mp 1.650), a Distance of 1.65 Miles. Asphalt Pavement & Roadway Rehab. Syp No. 12-09014.00. Minimum Wage Rates for These Forgoing Projects Have Been Predetermined by the Secretary of Labor and Are Set Forth in the Proposals. The Department of Highways Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation, and Will Not Be Discriminated Against on the Ground of Race, Color, or National Origin on Consideration for an Award. The Special Provisions of Highway Projects Financed With Federal Highway Funds Applies to Federal Aid Projects. These Forgoing Projects Contain a Percent That is Designated for Disadvantaged Business Enter- Prises (Minority Owned and Women Owned Businesses). See Proposal for Details. Proposals for These Projects Will Be Available at the Division of Construction Procurement Website. Contractors Must Register for Each Project They Intend to Bid. The Bidder Registration Form is Available on the Website. The Department Will Only Accept Bid Registration Forms From Contractors Who Are Prequalified in the Work Categories of the Particular Project. Registration Will Be Closed at 3:00 Pm on the Day Preceding the Letting. Questions may be submitted until this deadline with the understanding that the later a question is submitted, the less likely an answer will be able to be provided. KYDOT- Call 325 - Asphalt Pavement and Roadway Rehab - KY 80
Award
Roads / Highways
$1,013,053.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 26, 2023
February 27, 2023
KY-80, Pikeville, KY
Related To This Project
Pikeville, KY
Bid Date: Oct 20 2020
Pikeville, KY
Bid Date: Jan 25 2023
Pikeville, KY
Bid Date: Mar 16 2023
Pikeville, KY
Bid Date: Feb 23 2023
Pikeville, KY
Bid Date: Mar 02 2023
Pikeville, KY
Bid Date: Feb 23 2023
Pikeville, KY
Bid Date: Feb 28 2023
Pikeville, KY
Bid Date: Feb 28 2023
Pikeville, KY
Bid Date: Sep 14 2022
Pikeville, KY
Bid Date: Dec 10 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.