BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in San Mateo, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Location City Clerk, City Hall, 330 West 20th Avenue, San Mateo, California 94403 4th and 5 th Avenue Section 130 Improvements Projects - City Project Number: 46m001-46000-1000-46350/46m001-46000-1100-46350 Federal Aid Project No: STPL 7500 (281)/STPL 7500 (280) CONTRACT TIME: 40 Working Days The estimated construction cost of this project is $780,000 The Disadvantaged Business Enterprise (DBE) goal for this project is 35%; MBE (25.6%), WBE (6.9%) Remove Concrete (Curb, Gutter, Sidewalk, Driveway, Curb Ramp) - The price paid for Remove Concrete (Curb, Gutter, Sidewalk, Driveway, Curb Ramp) includes full compensation for: furnishing all labor, materials, tools, equipment and incidentals; doing all the work involved in removal of existing concrete sidewalk, curb ramps, driveway, curb, and gutter, including reinforcement; saw-cutting; and disposal. Sidewalk, Curb, and Gutter - The price paid for Sidewalk, Curb, and Gutter includes full compensation for: furnishing all labor, materials, tools, equipment, and incidentals to install sidewalk, curb, gutter; subgrade preparation; furnishing, placing, and compacting aggregate base; formwork; adjustment/replacement of utility boxes, covers, and risers within the sidewalk; placing and finishing concrete; installation of joints and joint material; concrete curing; and replacement of landscaping in-kind. Driveway - The price paid for Driveway includes full compensation for: furnishing all labor, materials, tools, equipment, and incidentals to install driveway; subgrade preparation; furnishing, placing, and compacting aggregate base; formwork; adjustment/replacement of utility boxes, covers, and risers within the driveway; placing and finishing concrete; installation of joints and joint material; and concrete curing. Curb Ramp (All Types) - The price paid for Curb Ramp (All Types) includes full compensation for: furnishing all labor, materials, tools, equipment, and incidentals to install curb ramps, complete and in place, including subgrade preparation, furnishing, placing, and compacting aggregate base, formwork, steel reinforcement, adjustment/replacement of utility boxes, covers, and risers within the curb ramp, place and finishing concrete, furnishing and installing detectable warning surfaces, installation of joints, replacing landscaping in-kind, and concrete curing. This bid item includes installation of curb and gutter adjacent to the curb ramp. 2" Full Width Grinding - The price paid for 2" Full-Width Grinding includes full compensation for: furnishing all labor, materials, tools, equipment, and incidentals; doing all the work involved in full-width grinding including, cold planning/grinding, working around existing roadway structures as needed; compaction of subgrade; and clean up, removal, and disposal of removed material (including pavement fabric). Measurement is irrespective of the number of passes required to cold plane/grind the areas to the specified measurements as shown on the Plans. Hot Mix Asphalt (Type A) - Overlay - The price paid for Hot Mix Asphalt (Type A) - Overlay includes full compensation for: furnishing all labor, materials, tools, equipment and incidentals; doing all the work involved in constructing hot mix asphalt overlay; tack coat application; any other surface preparation required; saw-cutting; excavation and disposal of excavated materials; hot mix asphalt placement; hand raking; compaction; and installation of blue fire hydrant markers. Hot Mix Asphalt (Type A) - Curb Ramp/Driveway Plug - The price paid for Hot Mix Asphalt (Type A) - Curb Ramp Plug includes full compensation for: furnishing all labor, materials, tools, equipment and incidentals; doing all the work involved in constructing hot mix asphalt plugs; tack coat application; any other surface preparation required; saw-cutting; excavation and disposal of excavated materials; hot mix asphalt placement; hand raking; and compaction. Adjust Manhole to Grade - The price paid for Adjust Manhole to Grade includes full compensation for: furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in adjusting sewer and storm drain manholes to grade. Adjust Valve/Monument Cover to Grade - The price paid for Adjust Valve Monument/Cover to Grade includes full compensation for: furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in adjusting valve and monument covers to grade. Adjust Utility Box to Grade - The price paid for Adjust Utility Box to Grade includes full compensation for: furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in adjusting utility boxes to grade. Thermoplastic Traffic Stripe - The price paid for Thermoplastic Traffic Stripe of the various details indicated includes full compensation for: furnishing all labor, materials, tools, equipment, and incidentals; doing all the work involved in furnishing and installing thermoplastic stripes; placement of temporary striping; establishment of cattracks; and placement of pavement markers. Measure thermoplastic traffic striping along the line of traffic stripes without deduction for gaps in broken traffic stripes. Measure double traffic stripe as one traffic stripe. Pavement markers associated with the traffic stripe detail are not counted or paid separately. Thermoplastic Pavement Markings - The price paid for Thermoplastic Pavement Markings includes full compensation for: furnishing all labor, materials, tools, equipment, and incidentals; doing all the work involved in furnishing and installing thermoplastic pavement markings; placement of temporary markings; and establishment of cat-tracks. Thermoplastic Green Bike Lane/Markings - The price paid for Thermoplastic Green Bike Lane/Markings includes full compensation for: furnishing all labor, materials, tools, equipment, and incidentals; doing all the work involved in furnishing and installing green bike lane/markings; placement of temporary striping; and establishment of cattracks. Curb Painting - The price paid for Curb Painting includes full compensation for furnishing all labor, materials, tools, and equipment to paint curb (two coats). Curb color is to be red unless otherwise specified. Roadside Sign - The price paid for Relocate Roadside Sign includes full compensation for: furnishing all labor, materials, tools, equipment, and incidentals; doing all work involved in relocating, replacing, removing existing signposts and signs; saw-cutting, excavation; and removal and off-site disposal of excavated materials. Type I Pedestrian Barricade - The price paid for Type I Pedestrian Barricade includes full compensation for: furnishing all labor, materials, tools, equipment, and incidentals; doing all work involved in furnishing and installing type I pedestrian barricade and signs; saw-cutting, excavation; foundations, and off-site disposal of excavated materials. 2" Conduit with Conductors - The price paid for 2" Conduit with Conductors shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, doing all the work involved in furnishing and installing 2" conduit with conductors via directional drilling method, complete in place including but not limited to utility potholing, and excavation and restoration of pavement for drilling/receiving pits or via open trench method, complete in place including but not limited to saw-cutting existing pavement, excavation and backfill, disposal of excess material, potholing of existing utility crossings (as needed), trench support, laying of bedding and pipe, surface restoration, compaction of sub-grade, aggregate base, crushed rock, slurry, asphalt pavement and restriping, and all other work as may be required to complete the installation. 5/8" Polypropylene Pull Tape - The price paid for 5/8" Polypropylene Pull Tape shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, doing all the work involved in furnishing and installing 5/8" Polypropylene Pull Tape, complete in place. All final questions and comments shall be submitted to the project engineer by end of business day on Tuesday, February 7th, 2023.

Award

Roads / Highways

$637,848.00

Public - City

Paving, Site Work

20

5

12

8

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
345
Active Projects
164
Bidding Soon
3,141
All Active Projects
1,231
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 16, 2023

April 20, 2023

July 11, 2023

img_map_placeholder

Multiple Locations, San Mateo, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.