BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a pipeline in Harrison, Tennessee. Completed plans call for site work for a pipeline.

MODIFICATIONS TO BIRCHWOOD LANDFILL GAS EXTRACTION SYSTEM ADDITIONS CONTRACT NUMBER S-22-002-201 The scope of work shall consist of two separate operations including but not limited to the following: Area 2 (Closed): Construction of five new vertical gas extraction wells and wellhead installations, abandonment of five existing wells, and installation of HDPE gas, leachate and air piping from abandoned wells to new wells. Area 3 (Active): Construction of 8 new vertical extraction wells and wellhead installations, 2-, 4- 8-, and 10-inch HDPE air, leachate and gas piping and two condensate traps. All bidders must be licensed and shall comply with all requirements of the State of Tennessee Contractor's Licensing Act. The City of Chattanooga is an Equal Opportunity Employer. A. The work covered by this Contract consists of furnishing, delivering, and installing all materials, equipment and products for the Modifications to the Birchwood Landfill - Gas Extraction System Additions, shown on the drawings. The work includes the following major elements: 1. Construction of 5 new vertical gas extraction wells within the closed Area 3 landfill waste footprint, including abandonment of 5 existing wells, new wellhead installations, and installation ofHDPE gas, leachate and air piping from abandoned wells to new wells. 2. Construction of 8 new vertical extraction wells within the active Area 2 landfill waste footprint, including new wellhead installations. 3. Installation of 2-, 4-, 8-, and 10-inch HDPE air, leachate and gas piping including associated 2 condensate traps, tie-ins to gas piping and cut-off valves. 4. As-built survey of pipelines and wells tied to the Tennessee State Plane coordinate system, furnished in paper and electronic format

Award

Pipeline

$805,905.00

Public - City

Site Work

10

15

11

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
148
Bidding Soon
1,288
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2023

March 30, 2023

Project location map

9327 Birchwood Pike, Harrison, TN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.