BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Northlake, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

The Town of Northlake reserves the right to reject any or all bids received. Direct questions regarding distribution of Contract Documents, and the design of Cleveland-Gibbs to Steve Templer, P.E., Halff Associates, Inc., at (817) 764-7480. This project includes the removal and relocation of approximately 5,065 linear feet of Cleveland-Gibbs Road. The improvements include increasing the width of the roadway from 22-feet to 28-feet from 11757 Cleveland-Gibbs to F.M. 1171. The work includes, but is not limited to, mobilization, preparation of right-of-way, traffic control, approximately 2,300 SY of 2-inch asphalt TY D and 4-inch asphalt TY B pavement on 8-inch Flexbase; approximately 14,849 SY of 8-inch Reinforced Concrete pavement on 6-inch lime treated subgrade, approximately 1,356 SY of 8-inch Continuously Reinforced Concrete pavement on 4-inch asphalt TY B; approximately 790 LF of 6-foot by 3-foot box culvert, 174 LF of 4- foot by 3 foot box culvert, and approximately 2,616 linear feet of Storm Drain, and pavement markings and signage. Bidders must submit a cashiers check, certified check, or acceptable bidders bond with their proposal as a guarantee that the Bidder will enter into a contract for the project with the Owner within fifteen (15) days of Notice of Award of the contract. The security must be payable to Town of Northlake in the amount of five (5%) percent of the bid submitted. Contractor must execute the contract, bonds and certificates of insurance on the forms provided in the Contract Documents. Contractors for this Project must pay no less than the prevailing wage rates for the area established by the Owner and included in the contract documents. Performance, Payment, and Maintenance Bonds are required. The Town of Northlake reserves the right to adopt the most advantageous interpretation of the bids submitted in the case of ambiguity or lack of clearness in stating proposal prices, to reject any or all bids, and/or waive formalities. Bids may not be withdrawn within ninety (90) days from date on which bids are opened.

Post-Bid

Roads / Highways

$6,000,000.00

Public - City

Paving, Site Work

180

5

21

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
67
Bidding Soon
3,530
All Active Projects
1,407
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.