Published March 4, 2023 at 7:00 PM

Updated October 11, 2024

Renovation of a municipal facility in Saint Paul, Minnesota. Completed plans call for the renovation of a municipal facility.

Description: State Project Number 02FR0026 Freeman Building Interior Lighting and Conrols This solicitation has been designated to be awarded to a State of Minnesota Targeted Group (TG), Economically Disadvantaged (ED), or Veteran-Owned Small Business. ONLY responses received from Contractors that are TG/ED/VO certified through the Department of Administration, Office of Equity in Procurement, will be considered. A. The work will done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1.) Remove and replace all interior light fixtures on all levels, excluding exit lights and specific downlight.. 2.) Remove and replace existing lighting control for interior light fixtures. Additional Description: This solicitation has been designated to be awarded to a State of Minnesota Targeted Group (TG), Economically Disadvantaged (ED), or Veteran-Owned Small Businesses. ONLY responses received from Contractors that are TG/ED/VO certified through the Department of Administration, Office of Equity in Procurement, will be considered. More information on the State of Minnesota Small Business Certification program may be obtained through the following link: electronically This solicitation includes qualification requirements. Attachment C of the Response Form contains the qualification requirements for the solicitation. Qualification requirements include, but are not limited to: Responding company has completed as a Prime Contractor the work for at least 2 contracts which have achieved Substantial Completion since January, 2016 for construction of Lighting and/or Power and/or Control Renovations. Each of these contracts MUST have had a construction value of $1,000,000 or greater. To view the Attachment C Qualification Form where the information above is located, as well as additional qualification requirements, go to the VirtuBid area of the plan room for this project and download the Response Form. All applicable attachments in the Response Form must be completed and uploaded before a bid can be posted in the plan room. Est. Completion Date: Sept. 22, 2023

Award

Municipal

$4,382,978.00

Public - State/Provincial

Renovation

46

9

9

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Barriers and Enclosures, Temporary Dust Barriers, Execution and Closeout Requirements, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Commissioning
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Ceilings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Pathways for Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
78
Bidding Soon
983
All Active Projects
374
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2023

March 31, 2023

img_map_placeholder

625 Robert St N, Saint Paul, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.