BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2026 at 8:00 PM

Updated June 11, 2026

Site work for a transportation facility in Evergreen Park, Illinois. Completed plans call for site work for a transportation facility.

As of May 28, 2026, construction is underway. Construction of the project began in April 2026. CTA Red Line Extension - Mainline Design Build. The Red Line Extension (RLE) project by the Chicago Transit Authority (CTA) is a significant infrastructure initiative aimed at extending the Red Line from the existing terminal at 95th/Dan Ryan to 130th Street. This 5.6-mile extension will include four new fully accessible stations near 103rd Street, 111th Street, Michigan Avenue, and 130th Street.

Under Construction

Transportation Terminals

$3,600,000,000.00

Public - City

Site Work

16

25

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
430
Active Projects
120
Bidding Soon
3,811
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2024

April 20, 2026

Project location map

Multiple Locations, Evergreen Park, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.